Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 15, 2010 FBO #3155
MODIFICATION

Z -- Powell Ranger Station Water Supply Line Replacement and Kelly Forks Work Center Water Supply Line Replacement - Solicitation 1

Notice Date
7/13/2010
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
AG-82B1-S-10-0421
 
Point of Contact
Joseph Wingfield, Phone: 3032755074, Jan D. Black, Phone: 931-232-4771
 
E-Mail Address
jwingfield@fs.fed.us, jdblack@fs.fed.us
(jwingfield@fs.fed.us, jdblack@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Experience Questionnaire Sup Tech Specs Powell RS - Drawings Kelly Forks - Drawings GENERAL DECISION ID20100012 06-04-2010 ID12 AWWA Disinfection C652-02 AWWA Disinfecting water Mains C651.05 AG-82B1-S-10-0421 Body AG-82B1-S-10-0421 SF 1442 RECOVERY: Powell Ranger Station Water Supply Line Replacement and Kelly Forks Work Center Water Supply Line Replacement THIS CONTRACTING ACTION IS BEING OFFERED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT. The Forest Service has a requirement for the following: Powell Ranger Station Water Supply Line Replacement: The Powell Water Supply Line Replacement project consists of approximately 4,770 LF of new 6" water main construction, upgrades to the spring box, upgrades to the reservoir, and a highway crossing. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications. Kelly Forks Work Center Water Supply Line Replacement: The Kelly Forks Work Center Water Supply line Replacement project consists of construction 1,730 LF of 2" water main, construction 2,450 LF of 4" water main, upgrades to the spring box, and upgrades to the reservoir. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications. No pre-bid site visit will be conducted but bidders offerors are encouraged to visit the site. Bidders are also encouraged to review Federal Acquisition Regulation (FAR) provision 52.236-3, Site Investigation and Conditions Affecting the Work (Apr 1984). Failure of the Contractor to ascertain the nature, location, and conditions which affect the work will not relieve the contractor from the responsibility for successfully performing the work without additional expense to the Government. For additional information regarding the site, contact Travis Mechling at 208-476-8210. Sealed Bid 100% HUBZone Set-Aside The project cost estimate is between $250,000 and $500,000. Performance and Payment Bonds will be required. Davis Bacon wage rates will apply. The performance period is approximately 120 calendar days from the issuance of the Notice to Proceed (NTP) for each bid item. All responsible Certified HUBZone sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the bidders will render a proposal ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//. The solicitation package is anticipated to be available electronically on 12 Jul, 2010 with an anticipated closing date of 12 Aug, 2010. The NAICS for this requirement will be 237110. NOTE: THIS PRE-SOLICITATION HAS A DUE DATE THAT IS FOR PLANNING PURPOSES ONLY. THE OFFICIAL DUE DATE WILL BE INDICATED IN THE REQUEST FOR PROPOSAL. ARRA Requirement: The Awardee will be subject to Section 1512(c) of the American Recovery and Reinvestment Act which requires each contractor to report on its use of Recovery Funds under the awarded contract. These reports will be made available to the public. PLEASE DO NOT CONTACT THE GOVERNMENT PRIOR TO SEEING AND REVIEWING THE REQUEST FOR PROPOSAL. Other pertinent information: NAICS: 237110 "Construction management, water and sewer line" Size Standard: $33.5M FSC: Z245 - Water Supply Facilities Solicitation number: AG-82B1-S-10-0421
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/ab4a1f4065f805e5a101dd10a39ec35a)
 
Record
SN02203946-W 20100715/100713234953-ab4a1f4065f805e5a101dd10a39ec35a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.