AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 1450, Pearson - Skubitz Big Hill Lake, KS
- Notice Date
- 7/13/2010
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
- ZIP Code
- 74128-4609
- Solicitation Number
- W912BV-09-R-1008
- Archive Date
- 8/12/2010
- Point of Contact
- Phyllis O. Jordan, 918 832-4120
- E-Mail Address
-
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-09-D-1003, TO 0004, 000405
- Award Date
- 7/13/2010
- Awardee
- HDB CONSTRUCTION, INC. (144525003)<br> 729 SE WEAR AVE<br> TOPEKA, KS 66607-1769
- Award Amount
- $15,606.04
- Line Number
- 1
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC As part of Operations and Maintenance, Army, Recovery Act, this modification is issued to HDB Construciton, Inc., to perform the following work: 1) Connect to existing 2-inch PVC stub out from toilet bldg and route to new exterior panel. Install 100 amp, 2 pole circuit breaker. Install (3) each #2 copper conductors with ground for building feed. 2) Circuits requiring extensions to the new EP-3 panel; a) Area light pole and fixture near dump station fed from pedestal pad #1. Splice #6 conductors with direct buried in-line splices. b) Re-feed circuit to group shelter bldg from panel EP-3. Splice #8 conductors with direct buried in-line splices. 3) South trailer dump station - Existing conductors (3) each #4 with ground extended to new location of panel EP-4 with 15 lineal feet of conduit and wire, install 11x17 in ground box (item #4). 4) Extend existing conductors to new panel EP-3 location, (4) each 2/0 copper conductors, 20 lineal feet. Install in ground quazite junction box with lid marked ELECTRICAL for splicing conductors. Box size is 11x17. Furnish and install 150 amp, 2 pole circuit breaker in panel for building power in new EP-3. 5) Add (1) sectionalizer to accomodate primary feed to transformer T-2. Install 150 feet of new underground primary from new sectionalizer to T-2. Single phase primary will be installed in 3-inch schedule 40 PVC at specified depth. Contractor to directional bore where possible. Also included are necessary concrete pad, electrical connections, and field testing. 6) Revise circuit breakers for Panels P-1, P-2, and P-3.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-1008/listing.html)
- Record
- SN02203505-W 20100715/100713234557-890874dc3f41c113b0f2ce3666ad7ad0 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |