AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 1450, Pearson - Skubitz Big Hill Lake, KS

Notice Date
7/13/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-1008
 
Archive Date
8/12/2010
 
Point of Contact
Phyllis O. Jordan, 918 832-4120
 
E-Mail Address
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-09-D-1003, TO 0004, 000405
 
Award Date
7/13/2010
 
Awardee
HDB CONSTRUCTION, INC. (144525003)<br> 729 SE WEAR AVE<br> TOPEKA, KS 66607-1769
 
Award Amount
$15,606.04
 
Line Number
1
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC As part of Operations and Maintenance, Army, Recovery Act, this modification is issued to HDB Construciton, Inc., to perform the following work: 1) Connect to existing 2-inch PVC stub out from toilet bldg and route to new exterior panel. Install 100 amp, 2 pole circuit breaker. Install (3) each #2 copper conductors with ground for building feed. 2) Circuits requiring extensions to the new EP-3 panel; a) Area light pole and fixture near dump station fed from pedestal pad #1. Splice #6 conductors with direct buried in-line splices. b) Re-feed circuit to group shelter bldg from panel EP-3. Splice #8 conductors with direct buried in-line splices. 3) South trailer dump station - Existing conductors (3) each #4 with ground extended to new location of panel EP-4 with 15 lineal feet of conduit and wire, install 11x17 in ground box (item #4). 4) Extend existing conductors to new panel EP-3 location, (4) each 2/0 copper conductors, 20 lineal feet. Install in ground quazite junction box with lid marked ELECTRICAL for splicing conductors. Box size is 11x17. Furnish and install 150 amp, 2 pole circuit breaker in panel for building power in new EP-3. 5) Add (1) sectionalizer to accomodate primary feed to transformer T-2. Install 150 feet of new underground primary from new sectionalizer to T-2. Single phase primary will be installed in 3-inch schedule 40 PVC at specified depth. Contractor to directional bore where possible. Also included are necessary concrete pad, electrical connections, and field testing. 6) Revise circuit breakers for Panels P-1, P-2, and P-3.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-1008/listing.html)
 
Record
SN02203505-W 20100715/100713234557-890874dc3f41c113b0f2ce3666ad7ad0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.