Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 03, 2010 FBO #3143
SOLICITATION NOTICE

J -- Repair/Replacement of HVAC system at Idaho National Laboratory

Notice Date
7/1/2010
 
Notice Type
Presolicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Idaho OperationsU.S. Department of EnergyIdaho Operations1955 Fremont AvenueIdaho FallsID83415
 
ZIP Code
83415
 
Solicitation Number
DE-SOL-0002049
 
Response Due
7/15/2010
 
Archive Date
8/14/2010
 
Point of Contact
Minor, Kelleen L 208-526-0144, minorkl@id.doe.gov
 
E-Mail Address
Minor, Kelleen L
(minorkl@id.doe.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
It is the intent of the Department of Energy-Idaho Operations Office (DOE-ID) to issue a Request for Proposals (RFP) as a small business set-a-side for the repair/replacement of the HVAC system located at the Idaho National Laboratory. CPP-663 maintenance & crafts warehouse building is a 49,537 square foot, two story concrete block building, sheathed with steel siding that was built in1980. The building houses offices, maintenance shops, storage and other support functions for INTEC. The second floor is entirely office space, with the exception of the utility corridor which houses the HVAC systems? heat exchangers and evaporative cooling equipment. The first floor contains a combination of offices, maintenance and craft shops and warehouse space. The HVAC system that services CPP-663 is obsolete, inefficient, in disrepair and not functioning as designed. The HVAC system will require significant repair to ensure functionality. The RFP will include the following Scope of Work: A.Project preparation and engineeringB.Work scope planning and preparation and executionC.Replacement of approximately 60 temperature sensors and Variable Air Volume (VAV) controllers in individual office spaces.D.Repair/Replacement of approximately 23 outside and recirculation air dampeners and motors. Assume 5 dampeners will be replaced and 18 repaired.E.Replace temperature sensors/indicators in the chilled glycol loop.F.Repair of leaks on heated glycol loop.G.Repair/overhaul 2 evaporative cooling units.H.Replacement of rigid media in 3 evaporative cooling unitsI.Repair/Replacement of water tank on 1 evaporative cooling unit.J.Repair/Replacement of 5 steam control valves and actuators on main heat exchangers.K.Repair/Replacement of 5 steam traps on main heat exchangers.L.Update of procedures for operations and system control. M.Revise and issue updated Piping and Instrumentation Design (P&ID) drawings for restored system.N.Installation of meter(s) for the monitoring of CPP-663 electrical consumption. Please note the above list is not all encompassing. Additional requirements may be added to actual RFP.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0002049/listing.html)
 
Record
SN02194907-W 20100703/100701235931-cd812051f175af7c500f736693ffcb1c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.