Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 27, 2010 FBO #3137
SOLICITATION NOTICE

Z -- Provide pavement markings at various bus stop locations

Notice Date
6/25/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Fort Bragg Contracting Center, Directorate of Contracting, ATTN: SFCA-SR-BR, Building 1-1333, Armistead & Macomb Streets, Fort Bragg, NC 28310-5000
 
ZIP Code
28310-5000
 
Solicitation Number
W91247-T-0094
 
Response Due
7/12/2010
 
Archive Date
9/10/2010
 
Point of Contact
Wendy McNorial, 910-643-7224
 
E-Mail Address
Fort Bragg Contracting Center
(wendy.d.mcnorial@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. REV 1 29 March 2010 SUBJECT: Project No. OA40005 9P at various locations, Fort Bragg, North Carolina. 1. Special Provisions and General Project Information: a. WORK SCHEDULE Starting date is THE EARLIEST DATE POSSIBLE AFTER NOTICE TO PROCEED and to be completed BY THE EARLIEST DATE POSSIBLE THEREAFTER. Work is to be scheduled and accomplished as to provide a minimum of disruption to the mission of the unit. b. LIQUIDATED DAMAGES N/A per day for each day beyond scheduled completion date. c. INSPECTION: Inspection will be by the Directorate of Public Works, Business Operations & Integration Division, Customer Service Branch, Fort Bragg, North Carolina. The contractor will notify Tom Patrick at (910)396-2667 Office, (910)303-5909 Cell, or Gary Lucas at (910) 432-6609 Office, (910) 635-7109 Cell, no later than three days prior to starting work. d. WORK AREA/SITE: The area/building will be occupied during accomplishment of work. Interference with and inconvenience to the occupants or routine use of the facility shall be held to a minimum. The contractor is responsible for providing such coverings, shields, and barricades as required to protect the facility occupants, furniture, equipment, supplies, etc., from dust, debris, weather intrusion, or other damages resulting from the required work/construction. THE JOB SITE WILL BE CLEANED AT THE END OF EACH AND EVERY WORKDAY. e. WORK LOCATION: Building is located off of Street, Fort Bragg, North Carolina. f. GOVERNMENT MATERIALS NONE. g. HOURS OF WORK: The contractor shall accomplish this work between the hours of 7:30 AM and 4:00 PM, Monday through Friday. No work will be done on weekends or Federal holidays without prior approval from the ordering officer. h. WARRANTIES: A warranty on workmanship for one year must be provided. Manufactures warranty on parts and/or materials must be provided at the time of work completion. i. SCOPE OF WORK: The contractor shall furnish all labor, materials, equipment, transportation, tools, supervision and any other items necessary grind old pavement marking and install new markings and bus stops at various locations that are in handout provided by DPW and per the following: (1)Traffic control must be maintained throughout project for safety of workers and traffic, per Fort Bragg IGD, MUTCD and NCDOT Traffic Control Standards. (2)All markings shall be heated in place thermoplastic and as specified by NCDOT and on their QPL. (3)The following are the locations and type of markings: Stop #2 82nd Airborne Divisions, ACAP (a)Approximately 1-8 word STOP and 1-8 word BUS. (b)REV 1 Approximately 60 LF of white 24 stop bars. (c)REV 1 Approximately 60 LF of white 8 marking. Stop #3 82nd Repel (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 60 LF white 24 stop bars. (c)REV 1 Approximately 60 LF of white 8 marking. Stop #4 Mini Mall (a)Approximately 1-8 word STOP and 1-8 word BUS. (b)REV 1 Approximately 50 LF of white 24 stop bars. (c)Approximately 125 LF of white 8 marking. (d)2 sets of 2 words YELLOW TOW AWAY ZONE. Stop #5 Moon Hall (a)Approximately 1-8 word STOP and 1-8 word BUS. (b)REV 1 Approximately 60 LF each white 24 stop bars. (c)REV 1 Approximately 100 LF of white 8 marking (d)REV 1 Approximately 130 LF of grinding Stop #6 Soldier Services Center (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 50 LF of white 24 stop bars. (c)REV 1 Approximately 50 LF 8 White line. (d)REV 1 Approximately 150 LF 8 of yellow hatching. Stop #7 WAMC (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 50 LF of white 24 stop bars. (c)Approximately 50 LF 8 white line. (d)REV 1 Approximately 60 LF of 8 yellow cross hatching. Stop #8 Sports USA (a)Approximately 1-8 word STOP and 1-8 word BUS (b)REV 1 Approximately 50 LF white 24 stop bars. (c)REV 1 Approximately 50 LF 8 white line. Stop #9 Library REV 1 DELETE (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 50 LF of white 24 stop bars. (c)REV 1 Approximately 50 LF of white 8 marking. Stop #10 NORTH PX (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 50 LF white 24 stop bars. (c)REV 1 Approximately 50 LF of white 8 marking. Stop #11 FAST Bus connector North Commissary (4 areas) (a)Approximately 4-8 word BUSES and 4-8 word ONLY, 2-12each white 24 stop bars. (b)REV 1 Approximately 50 LF white 24 stop bars. (c)REV 1 Approximately 220 LF of 8 white lines. (d)Approximately 4 each Straight directional arrows. (2 each in opposing directions) (e)Approximately 460 LF of existing parking spaces to grind up (f)REV 1 Approximately 4 each directional arrows to grind up Stop #11A REV 1 NEW STOP AREA (a)Approximately 1-8 word VAN and 1-8 word ONLY, (b)Approximately 50 LF each white 24 (c)Approximately 100 LF of white 8 (d)Approximately 100 LF of white 8 hatch marks. (e)Approximately 140 LF of white to grind up Stop #12 Landmark Inn REV 1 DELETE (a)Approximately 1-8 word STOP and 1-8 word BUS, (b)REV 1 Approximately 50 LF each white 24 stop bars. (c)REV 1 Approximately 100 LF of white 24 marking. (4)Notify DPW for final inspection. NOTE: Contractor must use all safety devices while on job site in accordance with all OHSA Regulations. *Point of contact for all questions, job site(s) access, etc. is the Project Manager; Ron Barbrey at (910)396-1699 * NOTE: All work will be accomplished in the most favorable industry standards/practices and installation will be in accordance with any Manufacturers Specifications/Recommendations/guidelines. NOTE: CONTRACTOR SHALL VISIT THE JOB SITE TO GATHER INFORMATION TO ENSURE THEY HAVE A COMPLETE UNDERSTANDING OF THE SCOPE OF WORK, MAGNITUDE OF WORK AND FULLFILL THEIR RESPONSIBILITY FOR THEIR OWN MEASUREMENTS, MATERIAL/PARTS, EQUIPMENT, ETC. NOTE: Contractor will coordinate the work schedule with the COR/INSPECTOR and Job Site Occupants. NOTE: CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE APPROPRIATE SECURITY OFFICE AND ANY/ALL OTHER GOVERNMENT OFFICIALS OR DEPARTMENTS NECESSARY TO ENSURE ALL WORK IS ACCOMPLISHED IN ACCORDANCE WITH ALL/ANY GOVERNMENT, STATE, LOCAL, ETC. REGULATIONS/GUIDELINES. NOTE: ANY/ALL ELECTRICAL WORK WILL BE IN COMPLIANCE WITH THE LATEST NATIONAL ELECTRIC CODE.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/0c641eee73e710a46a09c5c8e93babeb)
 
Place of Performance
Address: MICC Bldg. 2-1105, Stack C, Macomb St. Fort Bragg NC
Zip Code: 28310-5000
 
Record
SN02188424-W 20100627/100625234733-0c641eee73e710a46a09c5c8e93babeb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.