Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 19, 2010 FBO #3129
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 74945, Lake Texoma, Denison Dam, TX

Notice Date
6/17/2010
 
Notice Type
Award Notice
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-1011
 
Archive Date
7/18/2010
 
Point of Contact
Phyllis O. Jordan, 918 832-4120
 
E-Mail Address
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-09-C-1006, P00005
 
Award Date
6/16/2010
 
Awardee
EASKY CONSTRUCTION LLC (621288869)<br> 511 N JAVINE ST<br> SKIATOOK, OK 74070-1121
 
Award Amount
$20,000.00
 
Line Number
1
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Easky Construction, LLC., W912BV-09-C-1006 As part of Operations and Maintenance, Army, Recovery Act, modification has been issued to Easky Consruction, LLC., to perform the following work: Electrical Changes at Juniper Point West--1. The contractor shall furnish all materials, supplies, labor, equipment, superintendence, and all other services as required for the changes describe below. (a) Reimburse the contractor's cost for the Primary meter and transformers installed by the local Coop. See attached invoice from the local utility company. Amount in the contract is $19,587.50 and the Contractor was billed by the local utility in the amount of $29,369.73. Amount owed the Contractor is $9,782.23. (b) Change the electrical wire size to comply with the new park Design for electrical. The contract specifications will be revised to change the original scope of work to reflect changes in the wire schedule. Changes are as follows: 6000 feet USE-20-RHH ( 3 #2 with 1 #2 ground); Campsite--Conductor length (feet); (1) 165; (2) 141; (3) 96; (4) 58; (5) 82; (6) 92; (7) 100; (8) 70; (9) 65; (10) 107; (11) 69; (12) 71; (13) 96; TOTAL 2,212
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-1011/listing.html)
 
Record
SN02180475-W 20100619/100617235358-7390dd6196e8ece03cf4e57f33e2ab1a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.