Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 05, 2010 FBO #3115
SOLICITATION NOTICE

Z -- Patching and Overlay Paving Low Gap Road, Rabun County, GA

Notice Date
6/3/2010
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-8 Chattahoochee and Oconee National Forests, 1755 Cleveland Highway, Gainesville, Georgia, 30501
 
ZIP Code
30501
 
Solicitation Number
AG-435H-S-10-0015
 
Point of Contact
Marcia O'Connor, Phone: 770-297-3055, Kimberly B. Carithers, Phone: 770-297-2947
 
E-Mail Address
moconnor@fs.fed.us, kcarithers@fs.fed.us
(moconnor@fs.fed.us, kcarithers@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DESCRIPTION: Improvement of Low Gap Road on the Rabun County side. Work involves patching areas of the existing pavement that have failed and placing a 2-inch overlay along the entire portion of the road. Measurement and Payment shall be based on the square yard of patching and lineal tenth foot of roadway overlay. Total length of the project is 7,283 feet with approximately 1300 sq yd of deep patching and 25 sq yd of surface patching. For funding and award purposes, work is divided into a base bid length and three additive sections. The resurfacing course shall be Recycled Asphaltic Concrete 9.5mm Superpave, applied at a spread rate of 165 lbs per square yard. Areas requiring patching shall be marked by the government and shall be patched according to the appropriate detail on the drawings. The patching will be accomplished using two different types of patching. The Type A, also known as a deep patch, will be done by saw cutting the existing asphalt in the designated locations and excavating a minimum of 2-feet. The removed material will be replaced with 18-inches of suitable backfill material, 2-inches of #57 stone and 4-inches of binder course asphalt mix. The Type B, also known as a surface patch, consists of cleaning the designated area from all debris, placing a layer of CRS-2 sealcoat and compacting #7 stone chips into the sealcoat to provide a bridge over the failed area. Upon completion of the patching, the Contractor shall overlay the roadway with 2-inches of Hot mix Superpave as stated above. PROJECT LOCATION: The project is located on the Chattahoochee-Oconee National Forest, Chattooga River Ranger District, Rabun County, Georgia. The project begins at the Habersham Rabun County line and proceeds northeast for approximately 1.4 miles along Low Gap Road. ESTIMATE COST RANGE: between $100,000 and $250,000. The solicitation will be issued on an unrestricted basis (open to both small and large businesses). SOLICITATION DOCUMENTS, SPECIFICATIONS, AND DRAWINGS: The solicitation, AG-435H-S-10-0015 and related documents will be issued via FedBizOpps and will be available for downloading on or about June 18, 2010 at the website address: http://www.fedbizopps.gov/ All vendors are required to be registered in Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/435H/AG-435H-S-10-0015/listing.html)
 
Place of Performance
Address: Oconee Ranger District, 1199 Madison Road, Eatonton, Georgia, 31024, United States
Zip Code: 31024
 
Record
SN02168065-W 20100605/100603235701-b388ad56195d187340808ccc7b01d4ce (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.