Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 04, 2010 FBO #3114
SOLICITATION NOTICE

Y -- renovation bldg 18 rm147

Notice Date
6/2/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Veterans Affairs;Lebanon VA Medical Center, Room 117;1700 South Lincoln Ave, Bldg 18;Lebanon PA 17042
 
ZIP Code
17042
 
Solicitation Number
VA24410IB0268
 
Response Due
6/11/2010
 
Archive Date
6/26/2010
 
Point of Contact
Michael Bermes
 
E-Mail Address
cting
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Specification Attachment General Notes "All labor and supervision OSHA compliant and certified. "ICRA and Infection Control Plan; a plastic barrier erected inside the entrance door along with sticky mats as necessary on the floor to capture dust from foot traffic shall be used within the work area; negative air used throughout demo areas of work. "Necessary bonding cost indicated "Submittals required by VAMC available upon proposal approval. "All work completed by prime contractor and any subcontractors is covered by one year warranty on all parts and labor ""Demo" and "New Work" shall adhere to Plan Notes as indicated on Drawings 1 & 2 dated 4-08-2010 unless otherwise indicated. "Provide and install 7 @ AmCase Sink Stations with upper cabinets per attached drawings. "Provide and install 6 @ AmCase Work Stations with upper cabinets per attached drawings with Workrite Keyboard Trays Part No. UB-2180S-25J, Banana Board Platform w/ Part No. 3170-22tGB, Pinnacle arm 22" deep, Humanscale Monitor Arm Part No. FEA195, Front end adjuster with 6" adjustment for 19" monitors Part No. M7B1B9BTSL, M7 monitor arm. "Install new type L copper water lines by Cambridge Lee and insulated with ½" wall, split tube insulation by General Pipe. Tubing shall conform to Master Specification section 22 11 00. "Install new schedule 40 cast iron DWV piping by Tyler from existing mains to sink stations. Piping shall conform to Master Specification section 22 13 00. "Sink station traps shall be brass 1 ½", 17 ga. P trap with brass waste connection by Keeney, supply valves by Brass Craft or equal; trap wrap and valve covers by Truebro. Valves shall conform to Master Specification section 22 05 23. "Install sheet metal sweeps to air handler with flexible duct and grilles for split room 147D. "Refer to exclusions, add-on, and deduct sections if indicated. "Install EST3 addressable fire alarm system equipment with Audio and Mass Notification as indicated. "Seal all penetrations with approved fire rated material "Apply base - Johnsonite or Roppe 6" vinyl cove base as necessary throughout. Color TBD. 147 E, Rear Corridor, and Hall S "Since this is the entrance into the work area, shall construct construction dust barrier made of plastic erected inside the existing door as necessary. "Demo existing flooring and prep for new. "Install sheet vinyl - manufacturer Technoflor, series Fireside Collection, color 31112 Rosewood; shall include transition pieces as necessary. "Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Apply base - Johnsonite or Roppe Traditional Wall Base 6" vinyl cove base as necessary. "Install and locate fire alarm system equipment as necessary. "Demo and remove kitchenette, cap all plumbing for future use in 147K. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147B Restroom "Work to be done by others. It is understood that we may need to work on projects simultaneously; proper and professional coordination is expected. "Due to proposed fire alarm system upgrade, we will provide necessary equipment and wiring necessary to maintain code and interconnectivity; to be connected at later date following bathroom renovations. 147 C/D Exam rooms "Remove existing entrance door. "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis. "Apply base - Johnsonite or Roppe Traditional Wall Base 6" vinyl cove base as necessary - color TBD. "Existing Office Room 147D to be split into two separate exam rooms using non-structural steel; doorways and wall framing not to interfere with existing fan coils. "Steel framing to be 3 5/8" 12 gauge floor to plenum. "Install noise-reduction insulation between studs. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls finished and painted, Benjamin Moore - colors TBD. "Demo pass-through door and frame to 147L, stud, drywall, prep for paint. "Duct work adapting to existing fan coils with two supply diffusers (one for each office). "Move thermostats to new wall between offices. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures @ two per room; provide and install new diffusers (all colors shall be white). "Install new 3/0 x 6/8 x 5 ¾" welded frame doors with 2" head, 1 ¾" solid SC birch prefinished clear wooden flush door w/ 20 minute label for each office. Door hardware shall be Mckinney TA2714 4.5"x4.5" hinges, Rockwood 8" x 34" kickplate, Best 93k7ab lockset w/ interchangeable cores, LCN 4041 hw/pa closers, Rockwood 409 door stops. "Apply and finish door and floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Provide and install work station and sink station in each exam room, specifications as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined. "Core drilling for drain piping and water lines. 147F Exam "Demo pass-through door and frame to 147H, stud, drywall, and prep for paint. "Demo pass-through door and frame to 147i, stud, drywall, and prep for paint. "Demo and remove window and frame to 147G, stud, drywall, and prep for paint. "Install noise-reduction insulation between steel studs. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Provide and install work station and sink station in exam room, specifications as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined "Core drilling for drain piping and water lines. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147i Exam "Demo pass-through door and frame to 147E rear corridor adjacent to kitchenette; stud, drywall, and prep for paint. "Demo pass-through door and frame to 147F; stud, drywall, and prep for paint. "Install noise-reduction insulation between steel studs. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls finished and painted, Benjamin Moore - colors TBD. "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Provide and install work station and sink station in exam room, specifications as indicated in "General Notes" and as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined. "Core drilling for drain piping and water lines. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147K Exam "Existing walls patch, prep, and finish painted - Benjamin Moore - colors TBD. "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Provide and install work station and sink station in exam room; specifications as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined. "Core drilling for drain piping and water lines (if necessary). "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147L Exam "Demo pass-through door and frame to 147D, stud, drywall, and prep for paint. "Install noise-reduction insulation between steel studs. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls finished and painted, Benjamin Moore - colors TBD. "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Provide and install work station and sink station in exam room, specifications as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined. "Core drilling for drain piping and water lines. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147M Office/Exam "Demo existing flooring and prep for new. Install sheet rubber - manufacturer Nora Systems, series Environcare 2mm 4ft wide, color 2939 Lapis; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Existing walls patch, prep, and finish painted - Benjamin Moore - colors TBD. "Install outlets, data connections, and switches as needed. "Provide and install sink station only; specifications as indicated in "General Notes" and as shown in detail provided, upper and lower cabinet locks keyed differently; gypsum board soffit installed above each unit as determined. "Core drilling for drain piping and water lines. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147G File Room "Demo existing floor and prep for new. Install sheet vinyl - manufacturer Technoflor, series Fireside Collection, color 31112 Rosewood; shall include transition pieces as necessary. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Demo existing metal archway frame to 147E; stud, drywall, prep for paint. Install noise-reduction insulation between studs after framing for new door. "Install new 3/0 x 6/8 x 4" welded frame door with 2" head, 1 ¾" solid SC birch prefinished clear wooden flush door w/ 20 minute label. Door hardware shall be Mckinney TA2714 4.5"x4.5" hinges, Rockwood 8" x 34" kickplate, Best 93k7ab lockset w/ interchangeable cores, LCN 4041 hw/pa closer, Rockwood 409 door stop. "Apply and finish door and floor trim/molding as necessary. "Relocate wood filler panels to front face of existing shelving. 147H "Demo pass-through door and frame to 147F, stud, drywall, and prep for paint. "Install noise-reduction insulation between studs after framing. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls finished and painted, Benjamin Moore - colors to match existing. 147N "Demo wall section adjacent to 147 Entry; frame and install 4'W x 4"H Check-in window (to be approved by COTR) with 18" wide counter finished with plastic laminate manufactured by Nevamar, Series Solar Piazza PZ4001T. Counter shall be constructed to accommodate the Uniform Federal Accessibility Standards and shall be 36" from top surface to floor. "Apply 5/8" drywall, trims, molding - all finished and painted. Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Demo existing flooring and prep for new. Install carpet tile - manufacturer Bentley Prince Street, series Avant Gardia 36" x 36" tile; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Install and locate fire alarm system equipment as necessary. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147P "Demo existing flooring and prep for new. Install carpet tile - manufacturer Bentley Prince Street, series Avant Gardia 36" x 36" tile; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Demo existing ceiling and install new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new 2x4 light fixtures; provide and install new diffusers (all colors shall be white). 147Q "Demo existing flooring and prep for new. Install carpet tile - manufacturer Bentley Prince Street, series Avant Gardia 36" x 36" tile; necessary transitions included. "Apply and finish floor trim/molding as necessary. "Install outlets, data connections, and switches as needed. "Install cable jack; tie cable to existing cable system. "Existing walls prep, finish, and paint; Benjamin Moore - colors TBD. "Demo existing 220 outlet and electric to source. "Install and locate fire alarm system equipment as necessary. "Provide and install new speaker in ceiling; match existing; tie to existing sound system. "Adjust existing grid as necessary to accept new type Second Look II 2767 2x4 Tegular Tile with 15/16 grid; provide and install new light fixtures; provide and install new diffusers (all colors shall be white). Proposed Fire Alarm System Installation Upgrade Building 1st Floor 18A - using "EST3 Addressable Fire Alarm Voice System with Mass Notification" equipment. This will be the first audio section in Building 18 and will require head end equipment that will allow for future upgrades. Package includes all necessary equipment, wiring, installation, mounting, and specified services: "Programming "Testing "Integration into the existing campus-wide network "Wiring diagrams "Supervision of head-end terminations "Final check-out "One year warranty by qualified technicians The following areas listed below require speaker strobes with mass notification (already included in price) that are not located within the current 18-147 C & P Move area of work: "Outside Electric Closet Room 134 "In Volunteer Lounge Room 157 "In Office Room 140 "Outside Office Room 140 "In Facilities Management Conference Room 148 The entire fire alarm upgrade shown above should be included in quoted price. 18-147 C &P Move Proposal Base_________ Bond_________ Project Total_________
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/LeVAMC595/LeVAMC595/VA24410IB0268/listing.html)
 
Record
SN02166133-W 20100604/100602235127-cd6459166d0ba3d6973ec357dd1f199b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.