AWARD
M -- RECOVERY--M--PROJECT NUMBER 1680, Black Warrior and Tombigbee Rivers, AL Increase Costs to De-water, Clean, Inspect, Repair and Paint Spillway Gates at Bankhead Dam, Operation and Maintenance of Government-Owned Facilities and Equipment, (See Desc)
- Notice Date
- 6/2/2010
- Notice Type
- Award Notice
- NAICS
- 561210
— Facilities Support Services
- Contracting Office
- USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
- ZIP Code
- 36628-0001
- Solicitation Number
- W91278-217-ARRA
- Archive Date
- 8/8/2010
- Point of Contact
- Helene Mitchell, 2514416531
- E-Mail Address
-
USACE District, Mobile
(helene.s.mitchell@sam.usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W91278-06-C-0038, P00102
- Award Date
- 5/21/2010
- Awardee
- R & D MAINTENANCE SERVICES, INC. (037982410)<br> 409 N MAIN ST<br> HENNESSEY, OK 73742-1017
- Award Amount
- $820,913.35
- Line Number
- 0043
- Description
- (Subject Continued) BW&T/Alabama Coosa Project, Tuscaloosa, Alabama RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): R&D Maintenance Services,Inc., W91278-06-C-0038 This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Furthermore, the existing contract contract must be used because: 1) The contractor is already performing the work under a previous modification. 2) A detailed scope of work can not be prepared. The extent of the work and the resources needed can not be fully determined prior to setting the stop logs, de-watering, cleaning to remove scum, silt, and debris, and inspection. 3) The required repairs could be extensive and require specialized expertise and equipment. The amount and type of necessary repairs cannot be determined prior to the closure and inspections. 4) This contract enables repairs to begin immediately after and even during the inspections without a detailed scope of work so as to minimize the time the facilities are closed thus minimizing the impact on management of water levels and flows. The American Recovery and Reinvestment Act (ARRA) contains specific acquisition requirements that must be met when using funds appropriated by the Act. Acquisitions must comply with FAR, and to the maximum extent practicable, be awarded under competitive procedures as fixed-price (FP) contracts. The Mobile District intends to use the current CPAF contract to meet it requirements. Though not a FP contract, it was awarded competitively as a small business set aside. The contract type was selected to provide the contractor with the greatest incentive for efficient and economical performance, given the types of services to be performed. Furthermore, the existing Operation and Maintenance contractor has experienced personnel that are already on site and ready to perform the work. Accordingly, it is deemed to be in the best interest of the government and in compliance with the goals of the Recovery Act to use the existing Operation and Maintenance contract to accomplish the requirements listed above.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-217-ARRA/listing.html)
- Record
- SN02165518-W 20100604/100602234552-751c61a284427036293e2ec869fd8f4d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |