Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 03, 2010 FBO #3113
SOLICITATION NOTICE

F -- Irrigators needed to control water release and be present all hours when water use isneeded. Leaking ditches will also have to be shovel stopped.. Reasonable fitness will be needed to walk fields.

Notice Date
6/1/2010
 
Notice Type
Presolicitation
 
Contracting Office
Division of Contracting and General Services U.S. Fish & Wildlife Service911 NE 11th Avenue Portland OR 97232
 
ZIP Code
97232
 
Solicitation Number
80181AQ380
 
Response Due
6/21/2010
 
Archive Date
6/1/2011
 
Point of Contact
Jan Douglas Contract Specialist 5032316700 ;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
Pre-solicitation for US Fish & Wildlife80181AQ380 / Calipatria CA. / Project:The U.S. Fish and Wildlife Service, Portland, Oregon, has a requirement at the Sonny Bono Salton Sea National Wildlife Refuge, Irrigation Workers Ground Maint., NAICS Code 115115, PSC F006 Small Business size standard 7 Mil.Up to ten farm fields will be flood-irrigated under this contract. To accomplish irrigation services at SBSS NWR an irrigator will need to be present during all hours when water is being delivered by the irrigation district. Irrigation water is usually delivered in 24 hour cycles to concrete ditches at the top of each refuge farm field. The irrigator will be responsible for determining how much of the water can be spread over the sections of the field (flood irrigating) through slide gates without overflowing the ditch. When the portion of the field being irrigated is finished, the irrigator will be responsible for opening the next group of slide gates and irrigating the next sections of the field until the whole field is irrigated. This may take anywhere from 24 hours to three days depending on the size of the field. The irrigator will be expected to communicate with refuge staff and/or the irrigation district zanjero as appropriate in case of conflicts with field irrigations (e.g. insufficient water, too much water, leaking ditches etc). The irrigator is expected to be able to communicate by cell phone or other means with the refuge staff, supply their own transportation to and around the worksite as well as their own tools. Some shoveling of soil is expected to efficiently distribute water across all portions of the field. Minimum tail-water loss should occur. Some liquid fertilizer will be mixed in some of the irrigation water by refuge staff. Refuge staff will coordinate irrigation schedules with the contractor.Interested contractors must be registered in the Central Contractor Registration (CCR) and complete online representation and Certifications (ORCA) at http://www.bpn.gov prior to award of contract.This is a small business set aside.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/FWS/CGSWO/80181AQ380/listing.html)
 
Place of Performance
Address: Calipatria CA
Zip Code: 922339744
 
Record
SN02164469-W 20100603/100601234115-48a8241bb92ae28c9c291d29f9fa4253 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.