AWARD
Y -- RECOVERY--Y--PROJECT NUMBER 8410, Jacksonville Harbor, FL Construction Dredging (Phase III), 40-Foot Project, Cut-50 Through Lower Terminal Channel, Jacksonville Harbor, Duval County, Florida
- Notice Date
- 5/13/2010
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
- ZIP Code
- 32232-0019
- Solicitation Number
- W912EP-09-C-0031-AR85
- Response Due
- 5/12/2010
- Archive Date
- 7/11/2010
- Point of Contact
- Dolly Colwell, (904) 232-3739
- E-Mail Address
-
USACE District, Jacksonville
(Dolly.M.Colwell@us.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EP-09-C-0031-P00016
- Award Date
- 5/13/2010
- Awardee
- Great Lakes Dredge & Dock Company, LLC, 2122 York Road, Oak Brook, IL 60523
- Award Amount
- $5,497,445.00
- Line Number
- 0009AA 0009AE
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Great Lakes Dredge & Dock Company, LLC, W912EP-09-C-0031 Contract Award Amount equals $720,000.00 Recovery Funds, and $4,777,445.00 Non-Recovery Funds. This action is partially funded by the American Recovery and Reinvestment Act and was executed as a modification to contract W912EP-09-C-0031. This modification revised the dredging depth in AS-16 as a result of the presence of utility lines, added additional quantities of material in AS-18 and AS-19, and changed the disposal site to Buck Island. The authorized project provides for the deepening of the ship channel from Station 6+53.19 of Cut-50 to Station 65+00 of Terminal Channel to a depth of 40 feet and an expansion of the Chaseville Widener by 100 to 200 feet. To facilitate the authorized project, the Phase III deepening contract will dredge the Federal Channel to a required depth of 42 feet plus 2 feet of allowable overdepth. Total quantity to be dredged from the Federal Channel is approximately 1,508,000 cubic yards (cy). The Phase III contract will also include four (4) Local Service Facilities to be dredged to a required depth of 40 feet plus 2 feet of allowable overdepth. Total quantity to be dredged from the Local Service Facilities is approximately 130,000 cy. The contract will be divided into Base Bid and Option Bid Items as follows: (1) Base Bid: Federal Channel, Cut-50 Station 6+53.19 toCut-54 Station 3+50.17 (approximately 824,000 cy); (2) Option A: Federal Channel Cut-54 Station 3+50.17 to Terminal Channel Station 65+00 (approximately 684,000 cy); (3) Option B: Navy Fuel Depot Berth (approximately 50,000 cy); (4) Option C: NuStar Berth (approximately 16,000 cy); and (5) Option D: Chevron Berth (approximately 39,000 cy) and JPA Berth 8 (approximately 25,000 cy). All dredged material will be placed in the west end of Bartram Island (D/A-1 Cell A) which is located an average of 3.5 miles from the dredging location. Materials to be dredged consist of rock, consolidated materials consisting of dense compacted clay or silt, and unconsolidated materials consisting of sand, silty sand, silt and clay. Blasting will not be allowed under this contract.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP-09-C-0031-AR85/listing.html)
- Record
- SN02149299-W 20100515/100513235620-e3c3d1ab13f3a75b09e3b0afdd566f4d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)