Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 12, 2010 FBO #3091
SOLICITATION NOTICE

61 -- SDC Automation System - Solicitation

Notice Date
5/10/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
 
ZIP Code
36201
 
Solicitation Number
ANCDF-IFB-W10-1566
 
Archive Date
6/23/2010
 
Point of Contact
John Danielson, Phone: 256-238-0721 x 183
 
E-Mail Address
john.danielson@wancdf.com
(john.danielson@wancdf.com)
 
Small Business Set-Aside
N/A
 
Description
Solicitation Provide all labor, equipment and materials (identified as subcontractor) in accordance with this document and the SDC Automation System Engineering Work Package (EWP # AN-1715-SDC/Work Order # 265949). The scope of work includes, but is not limited to the following: SDC-CABT-900-SC PLC cabinet work: •1. Provide all material identified as "subcontractor" on the EWP and drawings. •2. Layout subpanel and mount wireway and DIN rail on subpanel. •3. Install the subpanel in the enclosure. •4. Install the enclosure in the SDC Monitoring House. •5. Install the PLC CONTROLLOGIX chassis (provided by WA) in the enclosure. •6. Install all DIN rail components in the enclosure. •7. Install 120VAC wiring in the enclosure. •8. Install jumpers in the enclosure. •9. Install 24VDC wiring in the enclosure •10. Install cables between the I/O modules and the interface modules. •11. Install cables between the I/O modules and the relays. •12. Install fuses in fuse blocks and analog interface modules. •13. Install conduit and wiring between the PLC cabinet and the circuit breaker panel. Communication cabinet work: •14. Install communication cabinet (provided by WA) in the SDC Monitoring House. •15. Install conduit, as needed, between the LPMD (building 695) electrical room and the SDC Monitoring house. •16. Install conduit, as needed, between the SDC Monitoring House and the SDC control room. •17. Pull communication cables (network fiber, telephone cable, etc. - provided by WA) between the LPMD (building 695) electrical room and the SDC Monitoring house. •18. Pull communication cables (network fiber, telephone cable, etc. - provided by WA) between the SDC Monitoring House and the SDC control room.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/ec98ac90ad13e441991ac201a6c95a54)
 
Place of Performance
Address: 3580 Morrisville Road, Anniston, Alabama, 36202, United States
Zip Code: 36202
 
Record
SN02144478-W 20100512/100510234231-ec98ac90ad13e441991ac201a6c95a54 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.