Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 15, 2010 FBO #3064
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 000030, Atlantic Intracoastal Waterway to St Johns River, NC Clearing and Spillway System Maintenance, Northern Disposal Areas 16, 19, and 21, Hyde and Pamlico Counties, NC

Notice Date
4/13/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Savannah, P.O. Box 889, Savannah, GA 31402-0889
 
ZIP Code
31402-0889
 
Solicitation Number
W912HN-10-B-0010
 
Response Due
3/18/2010
 
Archive Date
5/17/2010
 
Point of Contact
Bruce A Helms, 910-251-4580
 
E-Mail Address
USACE District, Savannah
(bruce.a.helms@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HN-10-C-0029
 
Award Date
4/13/2010
 
Awardee
YOUNG'S GENERAL CONTRACTING, INC. (933209314)<br> 5100 HWY PP<br> POPLAR BLUFF, MO 63901-1834
 
Award Amount
$791,677.10
 
Line Number
0001-0017
 
Description
Work consists of a clearing and spillway system maintenance project at Atlantic Intracoastal Waterway (AIWW) Northern Disposal Areas 16, 19, and 21. The project will include improvements to Disposal Areas 16 and 19 in Hyde County, NC and Disposal Area 21 in Pamlico County, NC. Each of these sites are used for disposal of maintenance dredging material from the AIWW. Improvements are needed at each site to prepare them for disposal of dredged material during the next AIWW dredging cycle for the Alligator Pungo Landcut and the Hobucken Landcut. The existing dikes at each site need to be raised to provide dredged material capacity. Clearing and grubbing of the dike footprint and borrow areas will be required prior to dike raising. The borrow for dike raising at each site is available within the existing diked area. Seepage control systems will be installed at each disposal area. In addition to dike raising and seepage control system installation, the existing spillway risers and pipes will be replaced. The existing spillway risers and pipes will be removed and replaced with corrugated metal D Shaped risers and 36 diameter corrugated pipe supported on timber cribbing.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-10-B-0010/listing.html)
 
Record
SN02120066-W 20100415/100413234647-73f52e6eae0851ed83cf5890f4e50e14 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.