Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 08, 2010 FBO #3057
SPECIAL NOTICE

D -- Vehicular Integration for C4ISR/EW Interoperability (VICTORY) Industry Days and Standards Body Kick-Off Meeting (4-5 May 2010)

Notice Date
4/6/2010
 
Notice Type
Special Notice
 
Contracting Office
CECOM Contracting Center (CECOM-CC), ATTN: AMSEL-AC, Building 1208, Fort Monmouth, NJ 07703-5008
 
ZIP Code
07703-5008
 
Solicitation Number
W15P7T-10-X-XXXX
 
Archive Date
7/5/2010
 
Point of Contact
Barbara Wines, 732-532-4848
 
E-Mail Address
CECOM Contracting Center (CECOM-CC)
(barbara.wines@mail1.monmouth.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The Vehicular Integration for C4ISR/EW Interoperability (VICTORY) Industry Days & Standards Body Kick-off meeting will be co-hosted by the Assistant Secretary of the Army (Acquisition, Logistics and Technology) ASA (ALT) System of Systems Engineering Office and CG, Research Development and Engineering Command (RDECOM). The event will take place May 4th and 5th 2010 in San Antonio, Texas. The focus of the conference is twofold: introduce Industry to the VICTORY Architecture and for Government to initiate the Working Groups of the VICTORY Standards Body. Details of the agenda and location and registration information are posted at www.victory-standards.org (129.162.104.103). VICTORY is an effort to develop, validate, demonstrate and maintain a set of open standards for the integration of Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) and related items of equipments on Army platforms. The goals are to facilitate a decrease in Size, Weight, and Power (SWaP) requirements, improve technology transition and provide evolutionary growth in capabilities. VICTORY standards will be developed in cooperation with industry and will be open to support multi-vendor implementation. It is the intent for these standards to be used in a large number of future acquisition programs. The special conference room rate will only be available until April 19, 2010. Those planning to attend the conference must register no later than by 1500 April 29, 2010. The VICTORY Architecture Documentation, the VICTORY Standards Plan, and the Preliminary VICTORY Standards Outline will be posted by 20 April. Participation in Industry Days is NOT a requirement for future participation in any future VICTORY activities or acquisitions citing VICTORY standards. Primary Point of Contact: Michele Hernandez, Michelle.Hernandez@swri.org (210)522-2260
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/77bb9f9470faa56dbb75026ca303c811)
 
Record
SN02113953-W 20100408/100406235127-77bb9f9470faa56dbb75026ca303c811 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.