Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 08, 2010 FBO #3057
AWARD

Z -- Storage Yard and Dike Repairs, Lock and Dam No. 12, Mississippi River, Bellevue, Iowa and Jo Daviess County, Illinois

Notice Date
4/6/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-10-R-0043
 
Response Due
3/25/2010
 
Archive Date
5/30/2010
 
Point of Contact
Brunson Grothus, (309)794-5241
 
E-Mail Address
USACE District, Rock Island
(brunson.e.grothus@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EK-10-C-0072
 
Award Date
4/6/2010
 
Awardee
WILLIAM CHARLES CONSTRUCTION COMPANY, LLC (187080440)<br> 5290 NIMTZ RD<br> LOVES PARK, IL 61111-3932
 
Award Amount
$4,767,120.99
 
Line Number
0001-0030
 
Description
Solicitation W912EK-10-R-0043 has been awarded under contract W912EK-10-C-0072. The work includes, but is not limited to, excavation, testing, and disposal of soil material contaminated with lead; minor demolition; clearing, grubbing, grading, and seeding on nonsubmersible dike; removal and disposal of Portland cement concrete paving on submersible dike; removal and disposal of reinforced concrete items (e.g., winch and guide sheave bases, and light foundations) in storage yard; soil sampling and testing of material not previously identified as contaminated; removal of chain-link fence and gates; Portland cement concrete paving of storage yard; placement of new reinforced concrete foundations for winches, guide sheaves, bulkhead truck rails; placement of new reinforced concrete perimeter walls; installation of new riprap and new grouted riprap; installation of sand berm; installation of aggregate driving surface; regrading and compaction of existing material in storage yard; placement of new aggregate, and compaction of entire aggregate base in storage yard; placement of Portland cement concrete on submersible and nonsubmersible dike; modification of bulkhead trucks; installation of chain-link fencing, gates, and handrails; cleaning and painting of miscellaneous items; minor electrical work; and survey monument installation and associated survey. Storage Yard and Dike Repairs, Lock and Dam No. 12, Mississippi River, Bellevue, Iowa and Jo Daviess County, Illinois.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK-10-R-0043/listing.html)
 
Record
SN02113399-W 20100408/100406234606-d61b1f3bb4db917b6f56ac5c4c8c5be9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.