Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 02, 2010 FBO #3051
AWARD

C -- RECOVERY--C--PROJECT NUMBER 76150, Upper Mississippi River Restoration, IL, IA, MN, MO & WI

Notice Date
3/31/2010
 
Notice Type
Award Notice
 
NAICS
541360 — Geophysical Surveying and Mapping Services
 
Contracting Office
USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-10-D-0001-0004
 
Response Due
3/17/2010
 
Archive Date
5/16/2010
 
Point of Contact
Erica L. Mallie, 309-794-5661
 
E-Mail Address
USACE District, Rock Island
(erica.l.mallie@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EK-10-D-0001-0004
 
Award Date
3/31/2010
 
Awardee
EISENBRAUN AND ASSOCIATES, INC. (070125554)<br> 215 WALNUT ST<br> YANKTON, SD 57078-4342
 
Award Amount
$106,048.53
 
Line Number
7001
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Contractor - Eisenbraun & Associates, Inc., Contract Number W912EK-10-D-0001 This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii). The U.S. Army Corps of Engineers, Rock Island District, has awarded a firm fixed price task order to survey approximately 8100 acres of lands and wetlands of the Rice Lake Fish and Wildlife area in Fulton County, Illinois, approximately 20 miles southwest of Peoria, on the Illinois River (Illinois Waterway). The work includes topographic mapping at two contour levels, cross-sections and profile of about 20,000 feet of existing levees and berms and sites for new drainage channels, and spillways. The site is subject to seasonal water fluctuations and some of the levee work will require execution by a shallow water hydrographic survey system. Also included is basic mapping of the entire project area at two differ ing contour intervals to aid in future design work. Products will include digital data files for the cross-section work and mapping. Staged delivery of survey products is required to accommodate ongoing design work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK-10-D-0001-0004/listing.html)
 
Record
SN02108818-W 20100402/100331235935-d38d6efb4e9e33e30b298fd8230e9635 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.