SOLICITATION NOTICE
C -- RECOVERY - TWENTY PERCENT DESIGN SERVICES FOR KAIBATO COMMUNITY SCHOOL REPLACEMENT
- Notice Date
- 3/23/2010
- Notice Type
- Presolicitation
- Contracting Office
- BIA-Albuquerque Acquisition Office 1001 Indian School Road NW, Room 347 Albuquerque NM 87104
- ZIP Code
- 87104
- Solicitation Number
- RA000210258
- Response Due
- 3/29/2010
- Archive Date
- 3/23/2011
- Point of Contact
- Judy Bodo Contracting Officer 5055633123 ;
- E-Mail Address
-
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
- Small Business Set-Aside
- N/A
- Description
- RECOVERY - THIS PROJECT IS FUNDED IN WHOLE OR IN PART BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009 AND IS SUBJECT TO THE TRANSPARANCY AND REPORTING REQUIREMENTS OF PUBLIC LAW 111-5 AND FAR 52.211-4. RECOVERY - THIS NOTICE IS FOR INFORMATION PURPOSES ONLY. IN COMPLIANCE WITH THE TRANSPARENCY AND ACCOUNTABILITY REQUIREMENTS ASSOCIATED WITH THE SUPPLEMENTAL APPROPRIATIONS PROVIDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUB. L. 111-5, THE GOVERNMENT INTENDS TO ISSUE A TASK ORDER TO ONE OF THE FOLLOWING CONTRACTORS UNDER THEIR EXISTING IDIQ CONTRACTS FOR ARCHITECT ENGINEER SERVICES. THE FOLLOWING IDIQ CONTRACTS ARE ELIGIBLE FOR THIS AWARD: CBK60050005 DYRON MURPHY ACHITECTS, PC; CBK60050008 PAIKI OF KENTUCKY, INC.; CBK60050003 SHP ENGINEERING & ARCHITECTURE; CBK60050002 WELLER ARCHITECTS PC; CBK60050001 WH PACIFIC INC. CBK60050009 COOPER-ZIETZ ENGINEERS INC. CBK60050001 WH PACIFIC INC. THIS REQUIREMENT CALLS FOR THE CONTRACTOR TO PROVIDE TWENTY PERCENT DESIGN PHASE SERVICES FOR KAIBATO COMMUNITY SCHOOL REPLACEMENT BASED ON AN EXISTING SET OF PLANNING DOCUMENTS THAT WERE DEVELOPED SEPARATELY. THE 20 PERCENT DESIGN EFFORT CALLS FOR THE PREPARATION OF DRAWINGS AND SPECIFICATIONS TO A SCHEMATIC LEVEL OF COMPLETENESS, CONDUCTING AN ON-SITE CHARRETTE, AND COORDINATING THEIR EFFORTS WITH SEPARATELY CONTRACTED COMMISSIONING AND VALUE ENGINEERING PROVIDERS. PERFORMANCE TIME IS 30 DAYS FOR THE DESIGN PHASE AND 50 DAYS FOR THE BID PHASE SUPPORT. THE REQUIREMENT ALSO CALLS FOR THE A-E CONTRACTOR TO PROVIDE BID-PHASE SERVICES DURING THE SUBSEQUENT COMPETITION FOR THE CONSTRUCTION PHASE SERVICES BY RESPONDING TO REQUESTS FOR INFORMATION CONCERNING THEIR DESIGN.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/RA000210258/listing.html)
- Record
- SN02100465-W 20100325/100324000100-ed949e5f3228c60f346e00d16c3d6ac9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |