SOLICITATION NOTICE
Y -- Construction of Phase 2 of the Blatchford-Preston Complex at Al Udeid Air Base, Qatar
- Notice Date
- 3/9/2010
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
- ZIP Code
- 22604-1450
- Solicitation Number
- W912ER-10-R-0005
- Response Due
- 4/30/2010
- Archive Date
- 6/29/2010
- Point of Contact
- Robyn Ratchford, 540-665-3676
- E-Mail Address
-
USACE Middle East District
(robyn.ratchford@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- This announcement is for the purpose of soliciting contractors interested in submitting a proposal to construct Phase 2 of the Blatchford-Preston Complex (formerly known as the Millennium Village) at Al Udeid Air Base in the State of Qatar. Project Scope: The project involves the construction of two residential dormitories and a subsistence warehouse. The dormitories are identically designed and will be constructed adjacent to each other. Each dormitory is approximately 9,300 finished square meters with 196 rooms. The warehouse is approximately 6,000 square meters and shall be constructed with masonry walls and a metal superstructure. The warehouse shall include both cold and dry storage for food and perishables. The project includes related site improvements, utilities, communications, fire protection and suppression and force protection features. The period of performance is 780 days. The magnitude of this construction project is between $25million to $100million. Additional Requirements: The contractor must be licensed to conduct business in the State of Qatar. Plans and Specifications: Two (2) sets of the solicitation will be issued on compact disk (CD) to prime contractors at no cost. The solicitation will not be provided to plan rooms, subcontractors, suppliers or vendors. The solicitation will not be available through the internet. Subcontractors, suppliers and vendors may request a copy of the planholders list after the RFP is issued in order to contact prime contractors regarding business opportunities. Contracting Procedures: The solicitation will be a request for proposal (RFP). Contract award will be based upon a best value analysis of all proposals. The evaluation criteria will be conveyed within the RFP. One or more of the items in the project scope may appear in the solicitation as an option item. The contract is to be awarded on a firm-fixed price basis only. Since the contract will be funded by a military construction appropriation the RFP will contain DFARS provision 252.236-7010, Overseas Military Construction-Preference for United States Firms. This provision states, in part, that military construction contracts funded by a military construction appropriation that are estimated to exceed $1,000,000 and are to be performed in countries bordering the Arabian Gulf shall be awarded only to US firms, unless, the lowest responsive and responsible offer of a US firm exceeds the lowest responsive and responsible offer of a foreign firm by more than twenty percent. Offers from firms that do not qualify as United States firms will be evaluated by adding twenty percent to the offer. U.S. Contractor Defined: To be considered a U.S. firm, the firm must be incorporated and have its corporate headquarters in the U.S.; have filed corporate and employment tax returns in the U.S. for a minimum of two (2) years (if required) and have filed State and Federal income tax returns (if required) for 2 years; have paid any applicable taxes determined to be due as a result of such filings; and employ U.S. citizens in key management positions. The tentative date for issuing Request for Proposal (RFP) W912ER-10-R-0005 is March 23, 2010. The tentative date for a Pre-Proposal Conference and Site Visit is March 31, 2010. The tentative date for receipt of proposals is April 30, 2010. Attendance at the site visit is limited to two (2) people per firm. Attendance is not mandatory. The site visit date is subject to change at any time due to air base operations. Information on the pre-proposal conference and site visit will be conveyed in the RFP. Planholders will be notified by email. Solicitation request: Firms interested in receiving this solicitation should send a written request to either the address listed above or e-mail or fax a copy to Mr. Rick Elder at richard.c.elder@usace.army.mil (voice 540-665-3690 and fax 540-665-4033). If sending an email message requesting the RFP you should copy Ms. Robyn Ratchford at robyn.ratchford@usace.army.mil (voice 540-665-3676). The request must state the name of the company, mailing and shipping addresses of the firm, telephone and fax numbers, point of contact, and reference the solicitation number (RFP number). Indicate on the request whether your firm is a prime contractor, JV, subcontractor, supplier, or vendor.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W912ER-10-R-0005/listing.html)
- Place of Performance
- Address: USACE Middle East District P.O. Box 2250, Winchester VA
- Zip Code: 22604-1450
- Zip Code: 22604-1450
- Record
- SN02087126-W 20100311/100309235054-7d7e1ef46d434d0987a504b466559b73 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |