MODIFICATION
J -- RECOVERY-SanDiego-MECHANICAL-IMPROVEMENT - Amendment 12 - BAS plans and Reflective ceiling plans
- Notice Date
- 3/5/2010
- Notice Type
- Modification/Amendment
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- General Services Administration, Public Buildings Service (PBS), Los Angeles Service Center (9PXC), 300 North Los Angeles Street, Suite 2300, Los Angeles, California, 90017-5460
- ZIP Code
- 90017-5460
- Solicitation Number
- RECOVERY-SD-MECHANICAL-IMPROVEMENT
- Point of Contact
- Henry Huynh, Phone: 7147221498, Thuy Ta, Phone: 415-522-3603
- E-Mail Address
-
henry.huynh@gsa.gov, thuy.ta@gsa.gov
(henry.huynh@gsa.gov, thuy.ta@gsa.gov)
- Small Business Set-Aside
- N/A
- Description
- Summary of changes on Mar 5 Revised Specs Additional questions and answers Overview Work at Schwartz 4th Site Visit Sign in Sheet Amended as follows: 1. Commissioning requirements are simplified. Document revisions are: SECTION 01 91 00 - COMMISSIONING has been replaced in its entirety by the new version posted. Specifications sections no longer used: SECTION 25 00 00-3.028 SECTION 25 00 00-3.029 SECTION 25 00 00-3.030 SECTION 25 00 00-3.031 SECTION 25 00 00-3.032 General modifications applicable to all specification sections: All prior references to Sections that are no longer used should be replaced with references to Section 01 91 00 2. A general synopsis of the project is posted. This is non-contractual, and is intended to provide a simple overview. 3. Chiller requirements are changed to require a 5 year extended parts and labor warranty on the chiller compressors. A change to the specifications will not be posted; this notice constitutes the change. 4. All alternates listed in the chiller design documents (Facilities Dynamics, LSW Engineers) are to be incorporated into the base bid for the chiller project (CLIN 1). 5. The requirement to repair condensate pans in the coils project (CLIN 4) is changed to require replacing condensate pans. A change to the specifications will not be posted; this notice constitutes the change. 6. CLARIFICATION: Costs related to the LON building automation system, to include engineering and programming, should be included in the CLIN 5 (BAS) price. All other costs associated with each projects requirements, to include on-board electronics such as chiller panels mounted on chillers, are to be included in the CLIN for the specific project. 7. CLARIFICATION: Because the various projects were originally developed by different engineering firms there is some inconsistency in Division 1 references, and between various Division 1 sections and the Agreement. Where there is a contradiction between any Division 1 specification and the Agreement, the Agreement takes precedence. 8. To include the Site visit sign in sheet on March 5, 2010 9. To include the additional Questions and Answers.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/9PXC/RECOVERY-SD-MECHANICAL-IMPROVEMENT/listing.html)
- Place of Performance
- Address: Schwartz Federal Building and USCH: 880 Front Street, San Diego, CA, United States
- Record
- SN02083852-W 20100307/100305234736-53854469f4a9dd5a2fb514eeeb5574d2 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |