Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 19, 2010 FBO #3009
AWARD

Z -- RECOVERY Z--Recovery Act - Clean HVAC Ducts

Notice Date
2/17/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;Birmingham VA Medical Center;700 South 19th Street;Birmingham AL 35233
 
ZIP Code
35233
 
Solicitation Number
VA-247-10-RA-0016
 
Response Due
2/2/2010
 
Archive Date
4/18/2010
 
Point of Contact
Tracy RileyContract Specialist
 
E-Mail Address
Contracting Officer's Email
(tracy.riley2@va.gov)
 
Small Business Set-Aside
N/A
 
Award Number
VA247-RA-0827
 
Award Date
2/17/2010
 
Awardee
THOMPSON INTERNATIONAL INC;2760 FRANKLIN COUNTY RD NW 1080;SULPHUR BLUFF;TX;754811080
 
Award Amount
136,500.00
 
Description
1.2 STATEMENT OF BID ITEM(S)A.BASE BID: Work includes items shown in the contract documents which can be described to, but not limited to: cleaning of high pressure and medium pressure supply ductwork, outside air duct work, return air duct work, VAV boxes, fan coil units, supply and return grills. Work limited to areas throughout the second thru ninth floors, and second and fifth floor mechanical rooms. Completion time is 120 calendar days. B.DEDUCTIVE ALTERNATE BID ITEM #1: All work on the main bid item and delete requirement to clean all high pressure supply air ductwork on the 2nd, 3rd and 4th floors. Completion time is 105 calendar days. C.DEDUCTIVE ALTERNATE BID ITEM #2: All work on Alternate Bid Item #1 and delete requirement to clean all outside air supply ducts on the 4th thru 9th floors. Completion time is 90 calendar days. D.DEDUCTIVE ALTERNATE BID ITEM #3: All work on Alternate Bid Item #2 and delete requirement to clean low pressure supply ducts on the 2nd, 3rd and 4th floors. Completion time is 75 calendar days. E.DEDUCTIVE ALTERNATE BID ITEM #4: All work on Alternate Bid Item #3 and delete the requirement to clean the VAV boxes on the 4th floor. Completion time is 70 calendar days. F.DEDUCTIVE ALTERNATE BID ITEM #5: All work on Alternate Bid Item #4 and delete the requirement to clean the VAV boxes on the 3rd floor. Completion time is 60 calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BiVAMC521/BiVAMC521/VA-247-10-RA-0016/listing.html)
 
Record
SN02067060-W 20100219/100217234832-dab34b448ae0f0fb5e163f27dcd8b641 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.