MODIFICATION
J -- Repair lift Stations - Mandatory Site Visit Attendees List
- Notice Date
- 2/10/2010
- Notice Type
- Modification/Amendment
- NAICS
- 541330
— Engineering Services
- Contracting Office
- Department of the Air Force, Air Combat Command, 633 CONS, 74 Nealy Avenue, Suite 100, Langley AFB, Virginia, 23665, United States
- ZIP Code
- 23665
- Solicitation Number
- FA4800-Q-BD-0001
- Archive Date
- 3/12/2010
- Point of Contact
- Beverly A. Turman-Dawson, Phone: 7577644918, Melissa S. Tamayo, Phone: 7577642922
- E-Mail Address
-
Beverly.Dawson.ctr@langley.af.mil, melissa.tamayo@langley.af.mil
(Beverly.Dawson.ctr@langley.af.mil, melissa.tamayo@langley.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Site Visit Attendees **A MANDATORY SITE VISIT IS SCHEDULED FOR THURSDAY, FEBRUARY 4, 2010 @ 9:00 AM (EST) TO ATTEND THIS SITE VISIT YOU MUST RSVP TO BEVERLY DAWSON ( BEVERLY.DAWSON.CTR@LANGLEY.AF.MIL ) NOT LATER THAN 2:00 PM (EST) FEBRUARY 3, 2010. PLEASE INCLUDE THE FULL NAMES OF THOSE THAT WILL BE ATTENDING. ALSO INDICATE IF A VEHICLE PASS WILL BE REQUIRED FOR ENTRANCE TO THE BASE. YOU WILL NEED VALID DRIVER'S LICENSE/REGISTRATION AND PROOF OF INSURANCE. WE WILL MEET AT THE CONTRACTING SQUADRON, 74 NEALY AVENUE, LANGLEY AFB. TRANSPORTATION TO THE VARIOUS SITES WILL BE PROVIDED BY THE GOVERNMENT. *WD 05-2543 (Rev 10) 5/26/2009 *REVISED 2/10/10 PERFORMANCE WORK STATEMENT TO REPAIR LANGLEY AFB LIFT STATIONS Scope of Work: The contractor shall provide non-personal services to furnish all labor, tools, equipment, transportation, materials, testing and supervision to repair or replace damaged components to all designated lift stations. 1. Removal: The contractor shall remove and dispose of storm damaged equipment in the lift stations identified by the Government. 1.1 Cleaning: The contractor shall clean the wet wells prior to installation of new equipment. 2. Replacement: The contractor shall provide all necessary equipment to: 2.1. Fabricate: The contractor shall fabricate stands to raise electrical panels as indicated. 2.2. Install: The contractor shall install new pumps, electrical panels, testing and any other equipment necessary to return lift stations to full operating order. 2.3. Electrical: All electrical conduit and connectors and junction boxes shall be liquid tight on both the conduit and connectors where required. 3. Safety: The contractor shall comply with all base safety standards and have a documented Confined Space Program. Lift Station 330 • Clean wet well • Remove existing pumps and dispose • Provide and install new Flygt MP3068, 3.8 hp,460 volt w/FLS sensor grinder pumps • Remove existing electrical panel • Remove existing SCADA panel and stand • Fabricate stand to raise electrical panel approximately 25 inches • Provide and install new electrical panel with MSU3-PC Multismart controller • Start-up and test system Lift Station 885 • Remove existing bubbler system and electrical panel • Fabricate stand to raise electrical panel 25 inches • Provide and install new electrical panel to operate existing CP3045, 1.8 hp, 460 volt pumps. Panel will have a MSU3-PC Multismart controller and 4 stainless steel floats to replace bubbler assembly • Start-up and test system Lift Station 886 • Remove existing bubbler system and electrical panel • Fabricate stand to raise electrical panel 25 inches • Provide and install new electrical panel to operate existing CP3045, 1.8 hp, 460 volt pumps. Panel will have a MSU3-PC Multismart controller and 4 stainless steel floats to replace bubbler assembly • Start-up and test system Lift Station 744 • Clean lift station • Remove and dispose of existing pumps • Install new 2ea. Flygt CP3085, 3hp, 208 volt pumps with FLS leakage sensor and 438 impellers • Start-up and test system Lift Station 328 South • Clean Lift Station • Remove existing pumps • Remove existing electrical panel • Remove existing valves and piping • Provide and install new 2ea. Flygt pumps CP 3127, 7.5 hp, with 4" discharge elbows, guide brackets, lifting chains and guide rails • Provide and install new valves and piping • Install new government provided electrical panel • Start-up and test system Lift Station 1022 • Remove existing junction box • Fabricate stand to raise junction box 30 inches • Install new stand and junction box • Pull new wire from panel to station • Start-up and test Station 747 Oil Water Separator • Remove existing separator, pump and piping • Provide and install new above ground Pan America Environmental water oil separator Model# OS16-F • Provide and install new 1 ea. motor driven diaphragm pump • Provide and install freeze protection for equipment • Provide and install piping from new separator to existing sanitary sewer • Start-up and test system Family Camp Lift Station • Provide and install a new complete lift station 48"x96" FRP basin with internal 2" stainless steel (SS) discharge pipe, SS guide rails, bronze gate and check valves, aluminum full cover with pump hatch, vent cap, junction box, 2" discharge pump elbows mounted in basin. 2 ea 3 hp. Flygt MP3085 Grinder pumps, 208 volt/ 3 phase power, Duplex control panel with MSU3-PC Multismart controller • Provide and install new valve vault • Provide and install new PVC valves in valve vault • Provide and install new electrical panel • Tie piping from existing lift station into new lift station • Clean out old lift station • Remove old equipment from old lift station and dispose • Remove old electrical panel from old lift station • Fill in old lift station and abandon in place • Start-up and test new station 4. Inspection: The contractor shall test all equipment for but not limited to leaks, freeze protection and flow. The contractor shall provide system specifications and written test results to the government representative prior to inspection. All work will be inspected by 633 CES prior to acceptance. 5. Warranty: Standard warranty is for this type of work is one year parts and labor. 6. Performance Period: 60 work days ARO (After Receipt of Order).
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/1CONS/FA4800-Q-BD-0001/listing.html)
- Place of Performance
- Address: Langley Air Force Base, Hampton, Virginia, 23665, United States
- Zip Code: 23665
- Zip Code: 23665
- Record
- SN02062445-W 20100212/100210234708-d8fd2c2fa28e9b93478ba2799b1cfc1e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |