Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 14, 2010 FBO #2973
SOLICITATION NOTICE

56 -- RECOVERY-REPLACEMENT OF PLANT AND FIRE CACHE BOILERS NAICS: 238290

Notice Date
1/12/2010
 
Notice Type
Presolicitation
 
Contracting Office
NER - Acquisition Philadelphia Office National Park Service200 Chestnut Street, 3rd Floor Philadelphia PA 19106
 
ZIP Code
19106
 
Solicitation Number
I4840091545
 
Response Due
1/26/2010
 
Archive Date
1/12/2011
 
Point of Contact
Diemhong Walters Contract Specialist 2155974623 Diemhong_walters@nps.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
RECOVERY. This project will be funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject to the reporting requirements of the action. NAICS of this project is 238290 and standard size of business is $14.0 M. This is a single competitive Firm Fixed Price procurement under 8(a) competitive set-aside business. This is a pre-solicitation notice for a contractor to provide all labor, materials, tools, supplies, equipment, transportation, and supervision to remove and replace the existing hot water furnaces and oil burners at Big Meadows Wastewater Treatment Plan and Big Meadows STP/Fire Cache at Shenandoah National Park-Luray-VA. The work consists of, but not limited to, the removal and disposal of the old boilers and the installation of the new boilers. All materials will be disposed of by the contractor in accordance with all local, federal and state laws. Below are requirements of this project I. Requirement/Duties for the Big Meadows STP Contractor will be required to provide all labor, supplies, equipment, materials, and miscellaneous items necessary to perform work as follows: 1. Remove and dispose of existing Weil McLain hot water furnace at the Big Meadows Wastewater Treatment Plant. (BL-484-WF with 9" smoke pipe).2.Install new cast iron hot water boiler and oil burner with heating output of 500 MBH minimum.3.Oil burner must work with #2 fuel oil mixed with up to 5% bio-diesel. 4.Make all connections of new unit to existing fuel line, electrical and 'smoke' discharge.5.Furnish and install new Aquastats and low water cut-off.6.500 MBH boilers must achieve at least an 87% combustion efficiency with fuel oil. II. Requirement/Duties for the Fire Cache 1.Remove and dispose of existing hot water furnace & oil burner at Big Meadows Fire Cache.2.Install new cast iron hot water boiler and oil burner with heating output of 300 MBH minimum.3.Oil burner must work with #2 fuel oil mixed with up to 5% bio-diesel. Make all connections of new unit to existing fuel line, electrical and 'smoke' discharge.4.Furnish and install new Aquastats and low water cut-off.5.300 MBH boilers must achieve at least an 86.8% combustion efficiency with fuel oil. III. Period of Performance of this work is sixty (60) calendar days after receipt of notice of award. The time stated for completion shall include final clean-up of the premises.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/I4840091545/listing.html)
 
Place of Performance
Address: SHENANDOAH NATIONAL PARK
Zip Code: 22835
 
Record
SN02040405-W 20100114/100112234901-8588cf5d34a45bc2f9c4b0f3bf8348ff (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.