Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 10, 2010 FBO #2969
SOURCES SOUGHT

Y -- US Department of State 2010 Design-Build Construction Services for US Embassy in Jakarta, Indonesia - Requrement and Notice of Solicitation of Submission for Contractor Prequalification

Notice Date
1/8/2010
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
U.S. Department of State, Office of Logistics Management, Acquisition Management, P.O. Box 9115, Rosslyn Station, Arlington, Virginia, 22219
 
ZIP Code
22219
 
Solicitation Number
SAQMMA-10-R0104
 
Archive Date
3/17/2010
 
Point of Contact
Zaldy N. Sabino, Phone: 703-875-6053, Jillian M. Savage, Phone: 703-516-1580
 
E-Mail Address
sabinozn@state.gov, savagejm@state.gov
(sabinozn@state.gov, savagejm@state.gov)
 
Small Business Set-Aside
N/A
 
Description
Notice to Offerors - US Flag Carrier Requirements Past Performance Questionnaire Percy Amendment Certification Requirements for Submission See Attached for Full Notice Department of State 2010 Design-Build Construction Services for Jakarta, Indonesia Request for Proposal (RFP) #: SAQMMA-10-R0104 Notice of Solicitation of Submissions for Contractor Pre-Qualification NOTE new format for submissions. THE U.S. DEPARTMENT OF STATE (DOS), Bureau of Overseas Buildings Operations (OBO) is requesting submissions to pre-qualify firms for Design-Build construction services for alterations to a commercial leasehold for U.S. Embassy facilities in Jakarta, Indonesia to include the General Work Areas (GWA) and Public Access Areas (PAA). The alterations and minor additions to the leasehold includes: demolition of ceiling suspension system & tiles, light fixtures; modifications (10,500 – 11,500 gsm) to electrical and mechanical systems on selected floors; Design-Build construction of a new office interiors including systems furniture installation with integrated wiring for telephones and data; and construction of support spaces such as locker and changing rooms for non-desk personnel; and coordinating existing electrical, fire alarm and mechanical systems with OBO standards. The work also includes installation of physical security products such as interior doors and windows from approved vendors, traffic control devises, and related security systems such as cameras and alarms. Project Description: (No Security Clearances Required) Jakarta, Indonesia – Lease Office Building (LSS) Renovation: Estimated Design-Build construction cost $7-12 million. Acquisition Phase I – Pre-Qualification of Offerors This announcement of solicitation of pre-qualification submissions is Phase I. DOS will evaluate and rate the pre-qualification submissions based on the procedure and evaluation criteria set forth below. DOS may refuse to pre-qualify any Offeror receiving less than a satisfactory rating on any evaluation factor or sub-factor. Acquisition Phase II – Requests for Proposals from Pre-Qualified Offerors Those Offerors determined to be pre-qualified in accordance with this notice will be issued a formal Request for Proposal (RFP) for the project and invited to submit proposed pricing in Phase II. The RFP will include a statement of work, design bridging documents and outline specifications that set out the project scope, design requirements, design process, design documentation, design expertise, construction process, post-construction activities; unique site constraints and requirements for maintaining security and operations during construction. The selected design build (D/B) contractor will be the “Designer of Record” and responsible for completing the design bridging drawings and specifications in accordance with the solicitation documentation provided. The contract will be “firm fixed-price.” Construction services will include providing construction labor and materials to execute the OBO-accepted design; on-site organization with management to ensure overall project coordination; and overall control throughout the life of the project. Required services include preparation of construction documents, quality control plans, safety plans, project schedules, cost estimates, and project close-out activities. The types of design services to be provided will include architecture; structural, civil, energy conservation, mechanical, fire protection, electrical, seismic engineering; space planning and systems furniture design and integration; interior design; signage; security; communications; cost estimating; scheduling; value engineering; and administrative coordination of the various disciplines involved. The bridging design documents will require site adaptation by the D/B contractor based on the project specific design direction that will be provided in the RFP. Due to time constraints, DOS anticipates that the pre-qualified Offerors will be required to participate in a visit to the project site within 10 to 15 days after the issuance of the RFP. To offset some of the cost of the site visit and other related costs, pre-qualified Offerors that do not receive the D/B contract award will be paid $15,000.00 for responsive project proposals they submit in Phase II. See Attached for Full Notice
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/State/A-LM-AQM/A-LM-AQM/SAQMMA-10-R0104/listing.html)
 
Place of Performance
Address: US Embassy in Jakarta, Indonesia, Jakarta, Indonesia
 
Record
SN02038302-W 20100110/100108235319-5e3e5142d98a930ac76df46f8867de4c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.