SOURCES SOUGHT
Y -- UT PRA ZION 10(5), Mt. Carmel Highway
- Notice Date
- 1/6/2010
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- UT-PRA-ZION-10(5)-MT-CARMEL-HIGHWAY
- Archive Date
- 1/28/2010
- Point of Contact
- Craig Holsopple, Phone: 7209633350
- E-Mail Address
-
craig.holsopple@fhwa.dot.gov
(craig.holsopple@fhwa.dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED TOTAL HUBZONE, 8(A), OR SERVICE DISABLED VETERAN-OWNED SMALL BUSINESSES TO SET THIS PROJECT ASIDE. (Details Below). Prime Contractors who are HUBZone small businesses, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation MUST submit the following by e-mail to CFLContracts@fhwa.dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (3 p.m. local Denver time) on January 13, 2010: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility – DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) letter from bonding agent stating your firm’s capability to bond for a single project of $8.0 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects involving asphalt pulverization, asphalt milling, and superpave pavement. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the Online Representations and Certifications Application (ORCA) located at https://orca.bpn.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: The UT PRA ZION 10(5) Mt. Carmel Highway project is located on Utah State Route 9 in Zion National Park, located outside of Springdale, UT, about 40 miles east of St. George, UT. This project is located in Washington and Kane Counties. The proposed project is in mountainous terrain. Elevations along the roadway range from 4400 feet to 5800 feet. The project begins about 1.5 miles North of the South entrance station in Springdale and proceeds 3.4 miles east to the West portal of the Zion – Mt. Carmel Tunnel. The purpose of the project is to rehabilitate, restore and resurface (3R) approximately 3.4 miles of Route 9. The project may involve nighttime work. Heavy restrictions on construction operations may occur during daytime hours over peak periods due to park traffic. Significant quantities include: 10,400 tons of superpave pavement 34,300 sqyd of asphalt pavement milling 61,000 sqyd of pavement pulverizing It is anticipated that this project will be advertised in early February with construction occurring from April to November, 2010. Estimated cost $6.0 to $8.0 million
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/UT-PRA-ZION-10(5)-MT-CARMEL-HIGHWAY/listing.html)
- Place of Performance
- Address: Zion National Park, Springdale, Utah, 84767-1099, United States
- Zip Code: 84767-1099
- Zip Code: 84767-1099
- Record
- SN02036441-W 20100108/100107000529-10530f4cc1e3fc03261a9d7c7f48324a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |