Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 11, 2009 FBO #2939
SPECIAL NOTICE

99 -- Design/Bid/Build Hazardous materials Storage Building, P-448; Naval Station Newport; Newport, RI

Notice Date
12/9/2009
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N40085 NAVFAC MID-ATLANTIC Naval Facilities Engineering Command, Mid-Atlantic Code AQ, 9742 Maryland Avenue Norfolk, VA
 
ZIP Code
00000
 
Solicitation Number
N4008510R9404
 
Small Business Set-Aside
N/A
 
Description
The following information is provided in response to a Contractor's Request for Information. Question 1: Will a formal bid schedule form be provided showing blank lines for the base bid amount and for the six (6) option's amounts? Answer: Yes. The bid schedule was posted on NECO, under the additional documents link, on 09 December 2009 for the solicitation. Question 2: In Section 01 11 00 Summary of Work, Item 1.10 Coordination Drawings states that one complete set of coordination drawings must be provided for this project before any major work occurs. Please clarify this requirement further since the project design documents by Ewing Cole shows layouts for the individual divisions (HVAC, plumbing, fire protection, electrical, etc.) on separate sheets. However, these design drawings do not shown all the divisions on one sheet. Answer: The coordination drawings are separate from the design drawings. Coordination drawings shall be provided post-award by the Contractor (with subcontractor input) as explained in Section 1.10.3 "Procedure". Question 3: In Section 13 34 19 Metal Building Systems, Item 1.4 System Description states that a complete, integrated set of metal building system's components and assemblies shall be provided. These components and assemblies shall include primary and secondary framing, metal roof and wall panels, and associated accessories. No specific manufacturer for the metal building system's components and assemblies was listed in the specifications. Will a list of acceptable manufacturers be provided from which one can be chosen to provide the metal building system complete? Answer: A list of specific manufactures will not be provided. Qualifications of the manufacturer shall comply with section 1.6.3 "Manufacturer's Qualifications".
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62470HR/N4008510R9404/listing.html)
 
Record
SN02020101-W 20091211/091209234849-e0928fb5a137c6bfd883625e9d23ada7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.