Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 04, 2009 FBO #2932
SPECIAL NOTICE

C -- RECOVERY--C--PROJECT NUMBER 134461, Atlanta Environmental Infrastructure, GA

Notice Date
12/2/2009
 
Notice Type
Special Notice
 
Contracting Office
US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-052-ARRA
 
Archive Date
3/2/2010
 
Point of Contact
Terricka D. Leonard, 251-441-6500
 
E-Mail Address
US Army Engineer District, Mobile
(terricka.d.leonard@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
RECOVERY PER FAR 5.7, THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THERFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER: W91278-07-D-0002, Engineering Design Technologies, Inc. The Mobile District, U.S. Army Corps of Engineers is placing a task order against Contract No. W91278-07-D-0002, Engineering Design Technologies, Inc., said contract being dated 27 November 2006, which has already been competed and awarded as an Indefinite Delivery Contract for AE Design Services. PROJECT DESCRIPTION: Cadd Code AE00001. This project consists of the design of a storm water infrastructure system to provide additional stormwater capacity by attenuating peak flows in an upper tributary (No. 3) of Noonday Creek in Cobb County, Georgia. The proposed facility impoundment will intercept a 1.7 square mile drainage area and would be constructed along Noonday Creeks upper tributary No.3, north of Williams Drive, NE, south of Mark Avenue NE, east of Bells Ferry Road NE, and west of Canton Road Connector NE, at latitude 33o5944 north and longitude 84o3232 west, in Cobb County, Georgia. No existing underground utility relocation is involved in this project. The footprint of the earthen fill for this proposed impoundment is roughly 90 X 300 feet. The proposed stormwater flow control structure that is proposed to be located within the impoundment structure will consist of a concrete weir and multi-barreled reinforced concrete culvert. Energy dissipation and bank stabilization measures shall be designed to prevent erosion of the channel and banks downstream.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-052-ARRA/listing.html)
 
Record
SN02015109-W 20091204/091203000135-f3a8b2a6b7863ef6a96da1185a5c7332 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.