Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 18, 2009 FBO #2916
SOLICITATION NOTICE

61 -- Motors, Electrical

Notice Date
11/16/2009
 
Notice Type
Presolicitation
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
DEFENSE LOGISTICS AGENCY; DLR PROCUREMENT OPS DSCR-ZBA;3001 STAFF DRIVE; TINKER AFB; OK; 73145
 
ZIP Code
73145
 
Solicitation Number
SPRTA1-10-R-0169
 
Response Due
1/2/2010
 
Point of Contact
Jennifer Metty, Phone 405-739-5491, Fax 000-000-0000, Email Jennifer.Metty@dla.mil
 
E-Mail Address
Jennifer Metty
(Jennifer.Metty@dla.mil)
 
Small Business Set-Aside
N/A
 
Description
SYNOPSIS: 6105-01-558-0905 HY, Motor, Electric(This effort was previously synopsized under SPRTA1-09-R-0692 & SPRTA1-09-R-0048)(1) Action Code: 3D (Sole Source)(2) Date: 16 November (3) Year: 2009(4) Contracting Office Zip Code: 73145(5) Classification Code: 61 -- Electric wire & power & distribution equipment NAICS: 336413(6) Contracting Office Address: DLA Procurement Ops, Tinker AFB Oklahoma(7) Subject: Procurement of Newly Manufactured Material of NSN 6105-01-558-0905 HY, Part Number: 04008000-10, Motors, Electrical.(8) Proposed Solicitation Number: SPRTA1-10-R-0169(9) Estimated Closing Response Date: 2 January 2010(10) Contact Point or Contracting Officer: Jennifer Metty (jennifer.metty@dla.mil)(11) Last Contract Awarded for this NSN: This NSN has never been procured. It is replacing NSN 6105-01-229-3758 which was last procured on 13 Dec 2004 from ONTIC Engineering & Manufacturing Inc. under FA8103-05-M-0071 for a qty of 5.(12) Unit Price on Last Contract was less than $6,000.00 each..(13) Contract Line Item Number: 0001(14) Estimated Contract Award Date: 30 April 2010(15) Contractor: This is a sole source acquisition to Technology Development Group, Inc., Shawnee OK 74804-9097, Cage Code: 0XRW4(16) Description: The alternating current motor is used to extend a landing gear on the C-5 Aircraft. Cylindrical in shape. Made of Aluminum, copper and iron. Approx 7.904" length, 3.5" width, 5.0 height, and weighs about 10 lbs. (17) Destination: Tinker AFB Oklahoma, 73145(18) Set-aside Status: N/A(19) Surplus: No(20) Export Control: No(21) Other Pertinent Information:A 3 year, IDIQ contract is contemplated with BEQs (for each 12 months) as follows: 151, 180, and 88 with a total contract maximum of 629. The contract minimum will be 151. The proposed contract action is for supplies and services for which the Government intends to solicit and negotiate with only one, or a limited number of sources under the authority of FAR 6.302. Interested persons may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for competitive proposals. However, all proposals received within forty five-days (thirty days if award is issued under an existing basic ordering agreement) after date of publication of this synopsis will be considered by the Government. A Determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. The solicitation will be available for download on the release date from www.fedbizops.gov. No telephone requests. Hardcopies of the solicitation will not be sent from this office. IAW FAR 5.207(c)(15)(ii), All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. To be eligible for contract award, offerors must be approved sources, in accordance with clause, Qualification Requirements, FAR 52-209-1. The Government is NOT required to delay contract award to review pending Source Approval Requests (SAR). Therefore, offerors are encouraged to submit SARs AS SOON AS POSSIBLE. If the Government has not completed review of a SAR when the contract is awarded the SAR will be retained and the source will be reviewed for possible source approval for future awards. If a SAR is obtained before contract award first Article may be required if vendor does not meet waiver requirements. If so, the solicitation will be amended to include first article line items and clauses. Note: An Ombudsman has been appointed to hear concerns from offers or potential offerors during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. Interested parties are invited to call the Ombudsman at, DSCR/ZBB, (405) 739-9073. DO NOT CALL THIS NUMBER FOR SOLICITATION REQUESTS. Questions concerning this synopsis or subsequent solicitation can be directed to Jennifer Metty at (405) 739-5491 or email jennifer.metty@dla.mil. Email submission of proposals will be accepted. Electronic procedure will be used for this solicitation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/SPRTA1-10-R-0169/listing.html)
 
Record
SN02004240-W 20091118/091116234726-a4192ff92b6618eb20ff4af61f95ae91 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.