AWARD
A -- RECOVERY GPM GMI 2
- Notice Date
- 11/4/2009
- Notice Type
- Award Notice
- NAICS
- 541712
— Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- Contracting Office
- NASA/Goddard Space Flight Center, Code 210.M, Greenbelt, MD 20771
- ZIP Code
- 20771
- Solicitation Number
- 4200315975-GDT
- Archive Date
- 11/8/2009
- Point of Contact
- Eric Jackson Newman, Contracting Officer, Phone 301-286-1892, Fax 301-286-1720, Email Eric.J.Newman@nasa.gov
- E-Mail Address
-
Eric Jackson Newman
(Eric.J.Newman@nasa.gov)
- Small Business Set-Aside
- N/A
- Award Number
- NNG05HY12C-84
- Award Date
- 10/9/2009
- Awardee
- Ball Aerospace and Technology Corporation 1600 Commerce Street Boulder, CO80306
- Award Amount
- $9,772,494
- Line Number
- 15
- Description
- The National Aeronautics & Space Administration (NASA) and the Goddard Space FlightCenter (GSFC) have a requirement for the Global Precipitation Measurement (GPM) MicrowaveImager (GMI) instrument 2. The GMI Instrument is a 13 Channel radiometer whose corescience measures the Earths atmospheric moisture within 10.65 GHz through 183 GHz of themicrowave spectrum.In fiscal year 2009, the GPM Program Office was granted authorization from NASAHeadquarters to procure a second GMI instrument. The Contracting Officer issued asynopsis to industry through the Federal Business Opportunities indicating NASAsintention to procure GMI Instrument 2 thru a sole source with Ball Aerospace & TechnologyCorporation (BATC). There were no responses from industry to the synopsis. TheContracting Officer issued a Justification for Full and Open Competition (JOFOC) for theGMI Instrument 2 which was approved by the GSFC Center Director on May 8, 2009. Similar to the GMI 1 requirements, GMI Instrument 2 needs to be procured for placement ona Low Inclination Observatory Spacecraft in order to provide more frequent samplings ofprecipitation events. The performance elements that will be covered under the American Recovery andReinvestment Act of 2009 include: CompleteInstrument Controller Assembly Printed Wire Board Main Reflector Delivery Cold Sky Reflector Delivery Subcontractor Long Lead Parts Delivered Subcontractor Start Fabrication of Circuit Card Assembly (start 9/1/10) Instrument Bay Structure Material Procurement CompleteInstrument Support Structure Material Procurement Complete Sunshade Material Procurement CompleteHot Load Shroud Material Procured Hot Load Fabrication Started (start 9/1/10)Instrument Controller Assembly Radiator Material ProcuredInstrument Controller Assembly Radiator Fabrication Started (start 9/1/10)
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/NASA/GSFC/OPDC20220/Awards/NNG05HY12C-84.html)
- Record
- SN01998339-W 20091106/091104235832-f004a412b36cc32500f905abafb9974c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |