SOLICITATION NOTICE
Z -- RECOVERY—PROJECT NUMBER FJKT091013, Repair Water Storage (S/R)
- Notice Date
- 11/4/2009
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Air Force, Air Education and Training Command, HQ AFCESA, 139 Barnes Dr, Suite 1, Building 856 Annex, Tyndall AFB, Florida, 32403-5319
- ZIP Code
- 32403-5319
- Solicitation Number
- DOVE-09-S-2838MOD2(FJKT091013)
- Archive Date
- 11/20/2009
- Point of Contact
- Douglas B. Scripture, Phone: 8502836111
- E-Mail Address
-
douglas.scripture@tyndall.af.mil
(douglas.scripture@tyndall.af.mil)
- Small Business Set-Aside
- N/A
- Description
- RECOVERY - "In compliance with the transparency and accountability requirements associated with the supplemental appropriations provided by the American Recovery and Re-Investment Act of 2009, Pub.L. 111-5, the Government posts this presolicitation notice of intent to issue a task order MODIFICATION under an established Indefinite Delivery Indefinite Quantity (IDIQ) type contract task order with Toltest, Inc., a Prime Contractors presently assigned to the Sustainment, Restoration & Modernization Acquisition Task Order Contract (SATOC), which is operated by HQ AETC CONS LGCT Office, c/o HQ AFCESA CONS CEKC at Tyndall AFB, FL. Toltest, Inc., was previously issued the task order to be modified. This notice is provided for INFORMATION PURPOSES ONLY. This task order modification calls for relocating the cross-over line between the new supply line and resevoir line to outside the chlorination building and replacement of the associated (previously-unknown) non-functioning valves; and, the construction of a protective enclosure for the newly elevated tank valve pit. The Government intends to issue a task order modification to Toltest, Inc., one of the SATOC Prime Contractors under the SATOC IDIQ, against the existing task order. Toltest, Inc’s., main point of contact is as follows--Companies interested in subcontracting opportunities should contact the POC listed: SATOCToltest, IncErnest Enrique419-794-3596Ernest.enrique@toltest.com The purpose of this project modification is to relocate the cross-over line between the new supply line and resevoir line to outside the chlorination building and replace the associated (previously-unknown) non-functioning valves to allow project completion and enable the water storage tank to be taken out of service (when maintenance is required) while maintaining water service to the base water distribution system. Additionally, the modification is to construct a protective enclosure for the newly elevated tank valve pit to protect system components from environmental factors (i.e. freezing, rain, etc..), and also reduce maintenance and operation costs by not having to handle stormwater within shelter (i.e. no need for sump pump) and providing longer life to system components.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/HQAFCESACEKC/DOVE-09-S-2838MOD2(FJKT091013)/listing.html)
- Place of Performance
- Address: Dover AFB, DE, Dover, Delaware, United States
- Record
- SN01997597-W 20091106/091104234651-0df3959eb60f7610eef16d2328c3e5ba (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |