Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 01, 2009 FBO #2899
AWARD

38 -- RECOVERY--38--John Day North Fish Ladder and Exit Count Station

Notice Date
10/30/2009
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Portland District, US Army Corps of Engineers, Contracting Division (CENWP-CT_, P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N09R0027
 
Response Due
9/10/2009
 
Archive Date
11/29/2009
 
Point of Contact
Kenneth G. Piper, 503-808-4619
 
E-Mail Address
Portland District, US Army Corps of Engineers
(kenneth.g.piper@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9127N-01-C-0042
 
Award Date
9/28/2009
 
Awardee
Slayden Construction Group<BR>500 Willamette Avenue<BR>PO Box 247<BR>Stayton, OR 97383
 
Award Amount
$4,415,085.74 All Recovery
 
Line Number
7001
 
Description
RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W9127N09C0039. Portland District Corps of Engineers awarded contract number W9127N-09-C-0042 using recovery act funding. This contract was awarded to Slayden Construction Group DUNS number 189739464, for The John Day North Fish Ladder and Exit Count Station, for the following procurement: Mobilization and Demobilization, $220,00.00; Remove and Dispose of Existing Electrical Equipment in Fish ladder Section 8 and Monolith 3 of the Non-Overflow Dam, $50,000.00; Construct New Weir, Floor and Diffuser Modifications at Fish Ladder Section 8 and Fish Counting Building Modifications, $50,000.00; Construct New Weir, Floor and Diffuser Modifications at Fish Ladder Section 8 and Fish Counting Building Modifications, $160,000.00; Furnish and Install New Walkways, Stairs, Work Platforms, and Handrails for the Fish Count Area, $50,000.00; Furnish and Install New Bulkhead, Picket Leads, Crowder, Light Box, and Window Washer at Fish Ladder Section 8, $600,000.00; Furnish and Install New Electrical Power Panels and Modify Existing Panels, and Install All Power and Controls for the Fish Count Station Equipment at Fish Ladder Section 8, $80,000.00; Furnish and Install New PLC Control System for the Count Station Equipment., $100,000.00. The total amount of Recovery Act Funding used for this contract award is $1,310,000.00 for base items and modified by P0001 to fund option items for $3,105,085.74 for a tolal price of $4,415,085.74
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N09R0027/listing.html)
 
Record
SN01995144-W 20091101/091030234846-e1984030b6804c3a0fcfe093d95f19bd (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.