FBO#2898
Y - Construction of Structures and Facilities
AWARDS - October 31, 2009
- NND09AB82TW - 401401
RECOVERY CONSTRUCT LIFE SUPPORT AND EGRESS FACILITY AT DRYDEN AIRCRAFTOPERATIONS FACILITY
CJW Construction, Inc 841 E. Washington Ave STE B Santa Ana, CA 92701-3878
- W91238-10-C-0002 - $11,697,979.43
DESIGN-BUILD 3RD FLOOR SURGERY ADDITION, GRAND JUNCTION, CO
The Neenan Company<BR>DUNS: 040715013<BR>2620 East Prospect Road, Suite 100<BR>Fort Collins, Colorado 80525<BR>
- W912P8-08-D-0038, Task Order 0004 - $540,000.00 Recovery
RECOVERY--Y--ARRA - HUBZONE MATOC TASK ORDER FOR BAYOU SORREL LOCK MATTING REPAIRS, IBERVILLE PARISH, LA ED 09-102
Merrick Construction (DUNS 002840783), 1332 Front St., Cottonport, LA 71327
- VA69D-RA-1248 RECOVERY ACT PROJECT - 469,000.00
RECOVERY Y--RECOVERY ACT 537-06-115ES; REROUTE CABLES BETWEEN ATS 1-8 AND EQUIPMENT IN ROOM 3472,BLDG 1.
IPB, LLC;831 OAKTON;ELK GROVE VILLAGE;IL;600071904
- W91278-09-C-0096 - $9,177,000,000.00
546-113, RENOVATE MIAMI OR PHASE I, MIAMI, FLORIDA (MIAMI-DADE COUNTY)
SDV Construction Group South, LLC.,10460 S.W. 178 Terrace, Miami, Florida 33157
- FA5004-10-C-C001 - $3,282,345.30 Estimated
RECOVERY--PROJECT NUMBER FTQW061004P2-REPAIR WASTE WATER TREATMENT PLANT PH2 (B2316)
White Mountain Construction LLC, 561 E Steel Loop Ste 200, Palmer, Alaska 99645, United States
- W9128F-08-D-0030-0002 - $9,586,051.44
RECOVERY--Y--STEAM TUNNEL REHABILITATION PROJECT(S) IN SUPPORT OF THE UNITED STATES ARMY GARRISON, WEST POINT
URS GROUP, INC.<BR>9901 1H 10 W<BR>San Antonio, TX 78230-2246
- C3200090025 - 870000
RECOVERY - UPGRADE ELECTRICAL DISBRIBUTION SYSTEM - PHASE III
DVORAK, LLC,9004 YELLOW BRICK RD STE F ,BALTIMORE MD 212372348
| This Issue's Index | Today's FBO Daily Index Page |
Created on 30-Oct-2009 by Loren Data Corp. -- info@fbodaily.com