Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 30, 2009 FBO #2897
SOLICITATION NOTICE

28 -- Airturbine Assemblies

Notice Date
10/28/2009
 
Notice Type
Presolicitation
 
NAICS
333611 — Turbine and Turbine Generator Set Units Manufacturing
 
Contracting Office
N66604 Naval Undersea Warfare Center Simonpietri Drive Newport, RI
 
ZIP Code
00000
 
Solicitation Number
N6660410R0200
 
Response Due
12/1/2009
 
Archive Date
12/16/2009
 
Point of Contact
Jacob L. Walker 401-832-7727 William Hurley, 401-832-1571
 
Small Business Set-Aside
N/A
 
Description
This synopsis is being posted to both the Federal Business Opportunities (FBO)page located at http://www.fbo.gov and the Navy Electronic Commerce on Line(NECO) site located at https://www.neco.navy.mil. While it is understood thatFBO is the single point of entry for posting of synopsis and solicitations tothe internet, NECO is the alternative in case FBO is unavailable. Please feelfree to use either site to access information posted by the Naval Sea SystemsCommand. Note: The Naval Undersea Warfare Center, Division Newport, Rhode Island is NOTaccepting quotes or proposals via submission through NECO. The Naval Undersea Warfare Center Division, Newport intends to award a SoleSource, Firm Fixed Price contract to Barber-Nichols, Inc., 6325 West 55thAvenue, Arvada, CO 80002 for the following items: 2 each Air Turbine Assemblies,with an option to purchase 1 each additional Air Turbine Assembly, 6 each ClutchKits, with an option to buy 8 each additional clutch Kits, and one lot of SpareSub-Components, with an option to buy one lot of Stator/Rotor Tie Rod bolts. Barber-Nichols is currently producing Air Turbine Assemblies for the Mk 21 ATPwhich have been proven to meet all the technical requirements. The Navy hasinvested considerable time and money into the design, development, testing andproduction of this component. Duplicating this effort for development of anothersource would cost the Navy in the millions which would not be recouped throughcompetition. In fact, these non-recoverable costs significantly exceed the totalestimated cost of the spare Air Turbine Assembly contract. Further, a newsupplier would require additional time between contract award and delivery ofthe spare units to account for the efforts described above, therebysignificantly impacting the mission readiness of the SEAWOLF and VIRGINIA Classsubmarine force. Required delivery is as follows: 2 each Air Turbine Assemblies, 1st at 92 weeksARO, and the 2nd at 16 weeks from 1st delivery; 1 each (opt 1) Air TurbineAssembly, 92 weeks after option exercise;6 each Clutch kits, 40 weeks ARO; 8each (opt 2) Clutch kits, 40 weeks ARO; 1 lot of Spare Sub-components, 56 weeksARO for bearings, 40 weeks ARO for tie rods, and 30 weeks ARO for the remainder;and 1 lot (opt 3) for additional tie rods, 30 weeks ARO after option exercise.F.O.B. Destination Naval Station Newport, RI. Size Standard is 1,000.Approximate date for the issuance of the solicitation is on or about September18, 2009. Contracting Office Address: N66604 Naval Undersea Warfare Center Simonpietri Drive Newport, RI Point of Contact(s): Jacob L. Walker 401-832-7727 William Hurley, 401-832-1571 jacob.l.walker@navy.mil Contracting Office Address: N66604 Naval Undersea Warfare Center Simonpietri Drive Newport, RI Point of Contact(s): Jacob L. Walker 401-832-7727 William Hurley, 401-832-1571
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSEA/N66604/N6660410R0200/listing.html)
 
Record
SN01993979-W 20091030/091028235520-cbe65009a178c6daf1acf94e815c7b0d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.