MODIFICATION
Z -- RECOVERY - Forest Wide BMP Upgrades - West Gold Road Reconstruction - Priest Lake RD - Idaho Panhandle NF
- Notice Date
- 10/23/2009
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
- ZIP Code
- 80401
- Solicitation Number
- AG-82B1-S-10-0019
- Archive Date
- 12/17/2009
- Point of Contact
- Beverly L Thompson, Phone: 3032755091, Rick Driggs, Phone: 208/265-6637
- E-Mail Address
-
beverlythompson@fs.fed.us, rdriggs@fs.fed.us
(beverlythompson@fs.fed.us, rdriggs@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- THIS AMENDMENT IS TO REMOVE THE SMALL BUSINESS SET- ASIDE IN THE ORIGINAL NOTICE. THIS PROJECT WILL BE ADVERTISED ON AN UNRESTRICTED BASIS.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/47bdbf6c59cfe0121f51a5bdd995cd1b)
- Place of Performance
- Address: The project is located within Bonner County, Idaho. From Sandpoint, travel south approximately 26.4 miles; turn left onto E. Parks Rd., 4.0 miles; right onto N. Good Hope Rd., 0.4 miles; left onto E. Bunco Rd., 1.7 miles; Begin work on Rd. 332 Bunco-High Drive, 6.21 miles; at MP 4.46 begin work on Road 2707, 6.81 miles and at MP 6.54 begin work on Road 278, 6/37 miles. The beginning of Road 332 is located in T53N, R2W, Center Sec. 28 and ends in T53N, R1W, SW 1/4 SEC 10., Sandpoint, Idaho, 83864, United States
- Zip Code: 83864
- Zip Code: 83864
- Record
- SN01991629-W 20091025/091023235801-47bdbf6c59cfe0121f51a5bdd995cd1b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |