Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 22, 2009 FBO #2889
SPECIAL NOTICE

Y -- RECOVERY--Y--PROJECT NUMBER TMA53, Modernize 3rd Floor Utilities - Center for Health Promotion & Preventive Medicine, Aberdeen Proving Ground, MD

Notice Date
10/20/2009
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-013-ARRA
 
Archive Date
1/18/2010
 
Point of Contact
Leigh Calvert, 251-694-3791
 
E-Mail Address
US Army Engineer District, Mobile
(leigh.a.calvert@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE CURRENT CONTRACT NUMBERS: John J. Kirlin Special Projects, LLC, W91278-08-D-0055 or W912DY-08-D-0023; Syska Hennessy Group Construction Inc., W91278-08-D-0056 or W912DY-08-D-0021; J and J Maintenance, Inc., W91278-08-D-0057 or W912DY-08-D-0024; Linc Government Services, LLC, W91278-08-D-0058 or W912DY-08-D-0022 under the Facilities Sustainment, Restoration, and Modernization Defense-Wide: Tricare Management Activity (TMA) Program. This Recovery Act approved project, Modernize 3rd Floor Utilities - Center for Health Promotion & Preventive Medicine, Aberdeen Proving Ground, MD, is to conduct repairs to the 3rd Floor of Building E2100, a laboratory facility of the US Army Center for Health Promotion and Preventive Medicine. The project includes repairs to the mechanical, electrical, and communication distribution systems on the 3rd Floor, as well as hazardous materials abatement and repair/ replacement of architectural features including walls, doors, finishes, casework, etc. In addition, limited features of work are required in other parts of the building in order to allow the 3rd Floor to be safe and fully functional. These items include structural reinforcement of the lower floors, replacement of the existing roof, and construction of an elevator to correct a code compliance issue. The project will be performed to meet LEED requirements. POC: Cynthia Y. Dunham, Contracting Officer, US Army Corps of Engineers, Mobile District, Mobile, AL 36602.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-013-ARRA/listing.html)
 
Record
SN01988835-W 20091022/091020235618-a23bfd92cc24166da79c499ba17f8c42 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.