SOURCES SOUGHT
J -- DRYDOCK FACILITY - description of sources sought
- Notice Date
- 10/20/2009
- Notice Type
- Sources Sought
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- Department of Homeland Security, United States Coast Guard (USCG), Commanding Officer (vpl), USCG Maintenance and Logistics Command - Atlantic, 300 East Main Street, Suite 600, Norfolk, Virginia, 23510-9102
- ZIP Code
- 23510-9102
- Solicitation Number
- USCGCMACKINAW2010DRYDOCK
- Archive Date
- 10/20/2010
- Point of Contact
- Sandra A Martinez, Phone: (757) 628-4591, Mildred A Anderson, Phone: (757)628-4637
- E-Mail Address
-
Sandra.A.Martinez@uscg.mil, mildred.a.FIGUEREO@uscg.mil
(Sandra.A.Martinez@uscg.mil, mildred.a.FIGUEREO@uscg.mil)
- Small Business Set-Aside
- N/A
- Description
- USCGC MACKINAW 2010 DRYDOCK The United States Coast Guard is issuing this sources sought to locate companies that have the capability to dry dock the USCGC MACKINAW. The yard must be able to lift the vessel using the following dimensions: The Principle Characteristics - 240' WLBB "Mackinaw" Icebreaker Length Overall - 240' 0" Depth (Main Deck at side to Baseline) - 24' 0" Maximum Beam - 58'0" Height of Highest Projection (above DWL) 95' 6" Frame Shaping - FR 19-25 = 19" FR 33-39 = 21" All Else = 20" Full Load Draft - 16'0" Full Load Displacement - 3625 KT Freshwater Shore Tie Voltage Requirements - 1200 Amp total 3EA 400A 450A 450VAC 3PH Ungrounded Forward/AFT stations Propellers/Shaft Number of Propellers - 2 Number of Blades per Propeller - 4 Diameter of Propeller 10.25' Pitch - 96.98" Revolution per Minute (Rpm) - 226 rated 270 max Shafting/Propulsion System - Azipod Dry dock Requirements for Azipod Work - ITEM Metric American Keel block height 2820 mm. 9.25 ft Available dock bottom aft of Aft Perpendicular 17,5 m 58 ft Available dock bottom forward of Aft Perpendicular 8 m 26 ft Azipod® and Cradle footprint 21 t/m2 2.15 t/ft2 Note: All weights measured in tons within this document are "metric tons" which is 1000kg, or approximately 2,200 lbs. The performance period will be for approximately eight four (84) calendar days with an anticipated start date on or about 1 June 2010. This availability will be a normal routine dry docking with many items being performed by the yard. The solicitation and specifications are anticipated to be issued January 2010. All Azipod work performed during this dry docking will be performed by ABB. ABB will require technical personnel and relevant machinery and equipment to support maintenance of the Azipod. All work will be identified in the specification when issued. This is a preliminary notice seeking companies capable of lifting the USCGC MACKINAW. As soon as firms are identified that can dry dock the vessel a pre-bid conference will be held to discuss all items required. Please respond by e-mail to sandra.a.martinez@uscg.mil or by fax (757) 628-4676.Questions may be referred to Sandra Martinez at (757) 628-4591.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/COUSCGMLCA/USCGCMACKINAW2010DRYDOCK/listing.html)
- Record
- SN01988379-W 20091022/091020234947-4576d68d00e74e7644be0b074f07e198 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |