Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 18, 2009 FBO #2885
SOLICITATION NOTICE

Z -- **RECOVERY** Buckeye Reservoir Campground Construction

Notice Date
10/16/2009
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
AG-82B1-S-10-0014
 
Archive Date
5/18/2010
 
Point of Contact
Paul Pierson, , douglas lee, Phone: 8014515180
 
E-Mail Address
paulpierson@fs.fed.us, douglaslee@fs.fed.us
(paulpierson@fs.fed.us, douglaslee@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
**Notification of Site Visit for Upcoming Project** This notice is being provided to advertise a pre-bid site visit only. The pre-solicitation notice and solicitation will be provided at a later date under this solicitation number. Site Visit Information Site visit is scheduled for Monday, October 26 at 1pm (meet at main entrance to site). There are no plans or specs at this time, but, a partial design of the contract will be available at the site visit as well as a walk through to allow prospective bidders to view the site and terrain. Job Location Buckeye Reservoir Campground is located on the Manti- La Sal National Forest on Paradox Road (NFSR 50371) approximately 54 miles southeast of Moab, Utah and 12 miles north of Paradox, Colorado. Job Description This project consists of constructing the Buckeye Reservoir Campground and Boat Ramp. The work shall include: closing and obliterating roadways; demolition and disposal (or salvage) of existing facilities (restrooms, picnic tables, fire rings, signs, bulletin boards, barrier rocks, etc); constructing a new campground, group areas, day-use picnic sites, gravel roads, gravel parking stalls, gravel spurs with family units and site furnishings ( fire rings, picnic tables); constructing a new pre-cast concrete boat ramp, gravel boat ramp parking area with gravel overflow parking area; installing post and pole fences and cattle guards; constructing a new gravel road and other site features (traffic control signs, site I.D. signs, bulletin boards, fee tubes); installing an electrical solar system at the campground host site; and installing 9 pre-cast concrete CXT toilet buildings. The project time will start in June 2010; project time: 120 days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/18803e80e6b851af32e8e8e22787d81c)
 
Place of Performance
Address: Manti-La Sal NF, Utah, United States
 
Record
SN01986671-W 20091018/091016234517-18803e80e6b851af32e8e8e22787d81c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.