AWARD
Z -- RECOVERY--Z--PROJECT NUMBER RM-137-09, Modernize Parking Lot Building 30 at Naval Air Station, Joint Reserve Base, New Orleans, LA.
- Notice Date
- 10/7/2009
- Notice Type
- Award Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- N69450 NAVFAC SOUTHEAST, PWD NEW ORLEANS Building 552 Naval Air Station - Joint Reserve Base New Orleans, LA
- ZIP Code
- 00000
- Solicitation Number
- N6945009Q5576
- Archive Date
- 10/22/2009
- Point of Contact
- Henry L. Camburn Jr (504) 678-2882
- E-Mail Address
-
henry.camburn1@navy.mil
(henry.camburn1@navy.mil)
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Award Number
- N69450-10-M-5569
- Award Date
- 10/7/2009
- Awardee
- Integrated Pro Services, LLC (DUNS 622564776)2701 General De Gaulle DriveNew Orleans, LA 70114
- Award Amount
- 76,800
- Line Number
- 0001
- Description
- In compliance with the transparency and accountability requirements associated with the supplemental appropriations provided by the American Recovery and Reinvestment Act (ARRA) of 2009, Pub.L. 111-5, the Government has awarded a Design Bid Build Construction contract, Modernize Parking Lot Building 30 at NAS-JRB New Orleans, LA. to Integrated Pro Services, LLC in the amount of $76,800.00. The Contractor shall provide all labor, material, equipment, transportation, plans and permits, and supervision necessary to Construct a Parking Lot addition for Building 30 (BCO). As shown in the site plan, construct an addition to the parking lot behind Building 509. Add 11 angled parking spaces (10' x 25') with striping and parking blocks. Provide necessary drainage as required and a ADA pedestrian sidewalk. The work includes clearing, grubbing, excavation, and disposal of any unsuitable material, backfilling, sub grade preparation, placement of geo-textile fabric, base course placement, placement of a binder course, placement of a wearing course, marking and striping, placement of parking bumpers, construction of an ADA compliant sidewalk with an ADA compliant footbridge from the parking lot over the existing drainage ditch to the existing walkway to Building 30, and incidental related work. The days for contract duration are figured from date of contract award to 60 calendar days which includes the initial 15 days allowed for mailing of the contract award, submission and approval of insurance, bonding and other requirements as set forth in the contract.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62467M/Awards/N69450-10-M-5569.html)
- Record
- SN01981541-W 20091009/091007235059-c821612a24fd4b731f5af7a080bf49c1 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice