Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 09, 2009 FBO #2876
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER RM-137-09, Modernize Parking Lot Building 30 at Naval Air Station, Joint Reserve Base, New Orleans, LA.

Notice Date
10/7/2009
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
N69450 NAVFAC SOUTHEAST, PWD NEW ORLEANS Building 552 Naval Air Station - Joint Reserve Base New Orleans, LA
 
ZIP Code
00000
 
Solicitation Number
N6945009Q5576
 
Archive Date
10/22/2009
 
Point of Contact
Henry L. Camburn Jr (504) 678-2882
 
E-Mail Address
henry.camburn1@navy.mil
(henry.camburn1@navy.mil)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Award Number
N69450-10-M-5569
 
Award Date
10/7/2009
 
Awardee
Integrated Pro Services, LLC (DUNS 622564776)2701 General De Gaulle DriveNew Orleans, LA 70114
 
Award Amount
76,800
 
Line Number
0001
 
Description
In compliance with the transparency and accountability requirements associated with the supplemental appropriations provided by the American Recovery and Reinvestment Act (ARRA) of 2009, Pub.L. 111-5, the Government has awarded a Design Bid Build Construction contract, Modernize Parking Lot Building 30 at NAS-JRB New Orleans, LA. to Integrated Pro Services, LLC in the amount of $76,800.00. The Contractor shall provide all labor, material, equipment, transportation, plans and permits, and supervision necessary to Construct a Parking Lot addition for Building 30 (BCO). As shown in the site plan, construct an addition to the parking lot behind Building 509. Add 11 angled parking spaces (10' x 25') with striping and parking blocks. Provide necessary drainage as required and a ADA pedestrian sidewalk. The work includes clearing, grubbing, excavation, and disposal of any unsuitable material, backfilling, sub grade preparation, placement of geo-textile fabric, base course placement, placement of a binder course, placement of a wearing course, marking and striping, placement of parking bumpers, construction of an ADA compliant sidewalk with an ADA compliant footbridge from the parking lot over the existing drainage ditch to the existing walkway to Building 30, and incidental related work. The days for contract duration are figured from date of contract award to 60 calendar days which includes the initial 15 days allowed for mailing of the contract award, submission and approval of insurance, bonding and other requirements as set forth in the contract.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62467M/Awards/N69450-10-M-5569.html)
 
Record
SN01981541-W 20091009/091007235059-c821612a24fd4b731f5af7a080bf49c1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.