AWARD
67 -- RECOVERY--67--Recovery - camera inspection of the relief wells, base contract.Recovery - Option 1 - camera inspectionRecovery - Option 2 - camera inspectionRecovery - Option 3 - camera inspection
- Notice Date
- 10/2/2009
- Notice Type
- Award Notice
- NAICS
- 541990
— All Other Professional, Scientific, and Technical Services
- Contracting Office
- US Army Corps of Engineer - Omaha District, 1616 Capital Ave, Omaha, NE 68102-4901
- ZIP Code
- 68102-4901
- Solicitation Number
- W9128F09R0101
- Response Due
- 9/14/2009
- Archive Date
- 11/13/2009
- Point of Contact
- Kim M. Koenig, 701-654-7411
- E-Mail Address
-
US Army Corps of Engineer - Omaha District
(kim.m.koenig@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W9128F-09-M-T043
- Award Date
- 9/28/2009
- Awardee
- Atlas Inspection Technologies Inc.<BR>Eric Sullivan<BR>500 Elliott Ave W Ste A<BR>Seattle, WA 98119-4358
- Award Amount
- 77,810.00
- Line Number
- 0001
- Description
- 1. GENERAL This scope of work (SOW) is for camera inspection services at Garrison Dam, North Dakota. Work generally consists of utilizing a remote operated camera to visually inspect 5 vertical relief wells within the powerhouse and several hundred feet of lateral drain pipes throughout the downstream embankment area, and producing a formal report to documents the condition of these features. Deliverables from this work will include DVD(s) of the inspection footage and a report that summarizes the procedures and findings of all inspections and includes individual inspection logs that summarizes the condition each pipe segment and documents the location of any significant observation. Detailed work requirements and the general execution of this SOW are provided below. All work shall be conducted in accordance with current professional standards, Corps of Engineers policies, regulations, and procedures, and the attached standard operating procedure (SOP). The Contractor is responsible for supplying all equipment, supplies, materials and personnel necessary for the completion of this work. 2.PERIOD OF PERFORMANCE AND BASELINE SCHEDULE The period of performance for the SOW shall be 6 calendar months from the date of Notice to Proceed (NTP). Upon receipt of NTP, the Contractor shall submit a draft baseline schedule for completion of the tasks in this SOW for approval to meet the milestones as indicated below. The baseline schedule shall be based on calendar days and shall include milestones for completion of each task provided herein.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F09R0101/listing.html)
- Record
- SN01979413-W 20091004/091002235714-176f58986a22d1c79425bb35e34b82dc (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |