Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 30, 2009 FBO #2867
AWARD

Y -- Modifications to State Road No. 90 (Tamiami Trail), Modified Water Deliveries to Everglades National Park, Miami-Dade County, Florida

Notice Date
9/28/2009
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Engineer District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP08R0025
 
Archive Date
10/28/2009
 
Point of Contact
Claurice Dingle, (904) 232-3736
 
E-Mail Address
US Army Engineer District, Jacksonville
(Claurice.M.Dingle@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-09-C-0060
 
Award Date
9/25/2009
 
Awardee
Kiewit Southern Company, 23680 NW 5th Street, Suite 130, Sunrise, Florida 33325
 
Award Amount
81,000,000.00
 
Line Number
0001 THRU 0016
 
Description
Project is on State Road No. 90, (U. S. Highway 41, Tamiami Trail) between mile post 13.692 to mile post 24.650. This project is also located from the L-31 North Bridge to the S-333 structure. The staging areas are located at S-333 and S-334. Due to limited staging area. layout of these areas will have to be coordinated with the Contracting Officer. Construction of one bridge on the eastern side of the project is offset from the road the width of the bridge. The bridge shall transition from the existing alignment of the road to the south. There is limited construction right of way for this project. The bridge and transitions shall have two 12 travel lanes and 10 shoulders. The transitions will require fill to raise the embankments. The extension of two culvert sets shall be required through the road embankment. Degrading the existing road and removal or modification of the existing culvert sets shall be necessary after completion of the bridge and transitions. The remainder of the project is to reinforce approximately 9.7 miles of road in the existing right of way. This will consist of milling and resurfacing, milling and overbuild, and milling and reconstruction of the road bed. This will be a firm fixed price contract for (3 ).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/Awards/W912EP-09-C-0060.html)
 
Record
SN01973038-W 20090930/090929000145-e11831055b51b27e54c73657b463c5e1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.