AWARD
Z -- RECOVERY--Z--PROJECT NUMBER P180M, TAS::97 0501::TAS RECOVERY PROJECT#::P180M::RP# PHOTOVOLTAIC SYSTEM, MCAGCC TWENTY-NINE PALMS, CA
- Notice Date
- 9/26/2009
- Notice Type
- Award Notice
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- N62473 NAVFAC SOUTHWEST, DESERT IPT CODE ROPDA 1220 Pacific Highway San Diego, CA
- ZIP Code
- 00000
- Solicitation Number
- N6871103D3001X096
- Archive Date
- 11/30/2009
- Point of Contact
- Pre-Award POCs: Monica Hernandez (619) 532-4052 Contract Specialist/Alternate Contact Point Melissa Bookheimer Contracting Officer, (619) 532-1301. Post-Award POCs: Andrew Hart (760) 830-3173 Contract Specialist/Charlene Ray Contracting Officer (760) 830-7414.
- E-Mail Address
-
monica.hernandez1@navy.mil
(monica.hernandez1@navy.mil)
- Small Business Set-Aside
- N/A
- Award Number
- N6871105D4012 0035
- Award Date
- 9/25/2009
- Awardee
- STRONGHOLD ENGINEERING INCORPORATED (DUNS 180672420)2000 Market Street, Riverside, California 92501-1769.
- Award Amount
- 3,487,127
- Line Number
- Base Item 0001
- Description
- RECOVERY-PROJECT NUMBER P180M, PHOTOVOLTAIC SYSTEM, MCAGCC, PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTORS UNDER THE DRY UTILITIES MACC. THE CONTRACTORS ARE: STRONGHOLD ENGINEERING, INC. (N68711-05-D-4012), SYNERGY ELECTRIC COMPANY (N68711-05-D-4013, AND SYSKA HENNESSY GROUP CONSTRUCTION, INC (N68711-05-D-4014). THE MACC CONTRACTORS WERE SOLICITED UNDER THE DRY UTILITIES MACC N68711-04-D-3001, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION AND RENOVATION OF VARIOUS DRY UTILITIES AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST DIVISION AREA OF RESPONSIBILITY (AOR) INCLUDING BUT NOT LIMITED TO ARIZONA, CALIFORNIA, NEVADA, AND NEW MEXICO THE RECOVERY ACT FUNDED PROJECT IS TO PROVIDE DESIGN AND INSTALLATION OF SOLAR PHOTOVOLTAIC ROOFTOP POWER SYSTEMS GENERATING 500KW ALTERNATING CURRENT POWER TO BE DELIVERED TO THE BASE POWER GRID. THE SYSTEMS SHALL BE DESIGNATED AND INSTALLED ON TOP OF VEHICLE HOLDING SHEDS 1201, 1202, 2008, 2067 AND 2068 FOR PROJECT P180M AT MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTY-NINE PALMS, CA.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711AB/Awards/N6871105D4012 0035.html)
- Record
- SN01971745-W 20090928/090926233839-3b5c43d4986607d3307a66f16bb360cd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |