AWARD
R -- Technical Support Services
- Notice Date
- 9/8/2009
- Notice Type
- Award Notice
- NAICS
- 561110
— Office Administrative Services
- Contracting Office
- Department of Energy, Federal Locations, All DOE Federal Contracting Offices, Various, Various locations, 20585
- ZIP Code
- 20585
- Solicitation Number
- DE-DT0000517
- Archive Date
- 9/19/2009
- Point of Contact
- Walker K. Love, Phone: 865-576-1220, Beverly S. Schultz, Phone: 865-576-2117
- E-Mail Address
-
lovewk@oro.doe.gov, schultzbs@oro.doe.gov
(lovewk@oro.doe.gov, schultzbs@oro.doe.gov)
- Small Business Set-Aside
- N/A
- Award Number
- DE-DT0000517-Mod010
- Award Date
- 9/4/2009
- Awardee
- Navarro Research & Engineering, Inc., 669 Emory Road, Oak Ridge, Tennessee 37830, United States
- Award Amount
- $2,844,751.00
- Line Number
- n/a
- Description
- Recovery Action: The Contractor will: (1) Health and safety oversight of the TRU Waste operations (2) Removal of Legacy material from Alpha 5 (Bldg at Y-12) in preparations for demolition. (3) Removal of Legacy material from Alpha 5 (Bldg at Y-12) in preparations for demolition. (4) Cleanup and removal of material from the Y-12 old salvage yard. (5) Demolition of the Biology Complex buildings 9211,9220, 9224, and 9769. (6) Expansion of the Y-12 landfill to provide for on-site demolition. (7) Expansion of the Y-12 landfill to provide for on-site demolition (8) Removal of legacy material and preparation of demolition. (9) Put in sentinel wells in Melton Valley for monitoring purposes. (10) Cap burial grounds swas 1 & 3. (11) Removal of contaminated soil and backfill with clean dirt. (12) Demolish various ORNL small facilities. (13) Demolish bldg 3026 hot cell facility. Duns # 005929810 Rationale for using other than a fixed price and/or competitive award: The work will be performed under a time-and-materials contract. The work is within the scope of the contract which was awarded as a GSA Multiple Award Schedule GS-00F-0092N, Task order-DE-DT0000517. The procurement was awarded through competitive means, and was not awarded as a fixed-price contract because it was not possible at the time of award of the contract to estimate accurately the extent or duration of the work or anticipate costs with any reasonable degree of confidence.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/Awards/DE-DT0000517-Mod010.html)
- Record
- SN01946287-W 20090910/090909090514-c8630d551271d4faf4cf15e6414dcc20 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |