SOLICITATION NOTICE
W -- Lightset Rental
- Notice Date
- 8/24/2009
- Notice Type
- Combined Synopsis/Solicitation
- Contracting Office
- Directorate of Contracting, Fort Irwin, CA 92310
- ZIP Code
- 92310
- Solicitation Number
- NTC-09-10-SEAR-17
- Response Due
- 8/27/2009
- Archive Date
- 2/23/2010
- Point of Contact
- Name: Client Services, Title: Sourcing Agent, Phone: 1.877.9FEDBID, Fax: 703.442.7822
- E-Mail Address
-
clientservices@fedbid.com;
- Small Business Set-Aside
- Total Small Business
- Description
- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, in conjunction with FAR 13.5, as applicable, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; bids are being requested and a written solicitation will not be issued. The solicitation number is NTC-09-10-SEAR-17 and is issued as an invitation for bids (IFB), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-34. The associated North American Industrial Classification System (NAICS) code for this procurement is 532310 with a small business size standard of $7.00M. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids. The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2009-08-27 18:00:00.0 Eastern Time or as otherwise displayed at www.FedBid.com. FOB Destination shall be Multiple shipping information. The USA ACA Fort Irwin requires the following items, Meet or Exceed, to the following: LI 001, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 1 September 2009 - 4 October 2009. Items will be delivered to the RUBA, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 10, EA; LI 002, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September 2009. Items will be delivered to FOB KING, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 30, EA; LI 003, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September 2009. Items will be delivered to FOB SEATTLE, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 004, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September 2009. Items will be delivered to FOB MIAMI, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 005, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September 2009. Items will be delivered to BICYCLE LAKE, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 006, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to FOB DENVER, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 007, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to FOB DALLAS, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 10, EA; LI 008, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to AL-JFF (JSS), located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 009, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to FOB AKTHAR, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 010, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to MEDINA JABAL, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 011, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to ABAR LAYLA (JSS), located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 012, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to KDD, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 013, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to MMA (JSS), located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 014, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 9 September 2009 - 26 September2009. Items will be delivered to AL SHARQ, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 015, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 18 September 2009 - 25 September2009. Items will be delivered to FOUR CORNERS, located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand 70+mph wind gusts and the rough, high desert terrain of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; For this solicitation, USA ACA Fort Irwin intends to conduct an online competitive reverse auction to be facilitated by the third-party reverse auction provider, FedBid, Inc. FedBid has developed an online, anonymous, browser based application to conduct the reverse auction. An Offeror may submit a series of pricing bids, which descend in price during the specified period of time for the aforementioned reverse auction. USA ACA Fort Irwin is taking this action in an effort to improve both vendor access and awareness of requests and the agency's ability to gather multiple, competed, real-time bids. All responsible Offerors that respond to this solicitation MUST submit the pricing portion of their bid using the online exchange located at www.FedBid.com. There is no cost to register, review procurement data or make a bid on www.FedBid.com. Offerors that are not currently registered to use www.FedBid.com should proceed to www.FedBid.com to complete their free registration. Offerors that require special considerations or assistance may contact the FedBid Helpdesk at 877-9FEDBID (877-933-3243) or via email at clientservices@fedbid.com. Offerors may not artificially manipulate the price of a transaction on www.FedBid.com by any means. It is unacceptable to place bad faith bids, to use decoys in the www.FedBid.com process or to collude with the intent or effect of hampering the competitive www.FedBid.com process. Should offerors require additional clarification, notify the point of contact or FedBid at 877-9FEDBID (877-933-3243) or clientservices@fedbid.com. Use of FedBid: Buyers and Sellers agree to conduct this transaction through FedBid in compliance with the FedBid Terms of Use. Failure to comply with the below terms and conditions may result in offer being determined as non-responsive. NO remanufactured or "gray market" items. All items must be covered by the manufacturer's warranty. Bid MUST be good for 30 calendar days after close of Buy. Shipping must be free on board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. Offeror must be registered in the Central Contractor Registration (CCR) database before an award can be made to them. If the offeror is not registered in the CCR, it may do so through the CCR website at http://www.ccr.gov. Delivery must be made by the first day of the period of performance. Delivery will be made to the Fort Irwin, CA area (ZIP 92310). Specific delivery and point of contact instructions will be provided upon award of contract. The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the following clauses in paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at http://www.acqnet.gov/far. In accordance with DFARS 252.232-7003, "Electronic Submission of Payment Requests and Receiving Reports", the contractor shall submit their payment request electronically using the WAWF. The WAWF website is located at https://wawf.eb.mil. There is no charge to use WAWF. Contractors must register to use WAWF at this website and ensure an electronic business point of contact (POC) is designated in the Central Contractor Registration (CCR) site at http://www.ccr.gov within ten (10) calendar days after award of this contract. Contractor training is available at the website home page under "about WAWF". Contractors may contact the WAWF Customer Support for assistance toll free at 866-618-5988; commercial: 801-605-7095; Fax commercial: 801-605-7453 or CSCASSIG@CSD,DISA.MIL. The Government reserves the right to vary quantities by +/- 30% due to operational requirements and to make multiple awards to meet said requirements Contractor shall remove all contracted leased equipment from the specified locations within 48 hours after the period of performance ends. Should contracted leased equipment remain in place beyond 48 hours, the Government is not liable for usage, theft, lost, damages, or replacement cost due to contractor's negligence to take possession of owned items. The contractor shall coordinate with the Contracting Officer's Representative (COR) at each site to assure placement at correct locations. See attached requirements for movement in/out of training area on Ft. Irwin The Government shall not be charged for early return of lea -- Please refer to FedBid for complete list of contract requirement(s) and terms and conditions.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABK/DABK17/NTC-09-10-SEAR-17/listing.html)
- Place of Performance
- Address: Multiple shipping information.
- Zip Code: Multiple
- Zip Code: Multiple
- Record
- SN01923310-W 20090826/090825000743-0a2c9c79ebfeeaccc9ee3324e54a6b55 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |