Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 20, 2009 FBO #2826
MODIFICATION

Z -- RECOVERY Z--RECOVERY ACT - Renovate Supply, Processing and Distribution

Notice Date
8/18/2009
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs, VA Black Hills Health Care System, Department of Veterans Affairs Black Hills Health Care System, Department of Veterans Affairs;VA Black Hills HCS;Fort Meade Campus;113 Comanche Rd.;Fort Meade SD 57741
 
ZIP Code
57741
 
Solicitation Number
VA-263-09-RA-0079
 
Response Due
8/24/2009
 
Archive Date
9/23/2009
 
Point of Contact
Chris Esper, Contracting Officer, 605-347-7030<br />
 
E-Mail Address
Contracting Officer
(Christopher.Esper@va.gov)
 
Small Business Set-Aside
Veteran-Owned Small Business
 
Description
Addendum #1 Project: Renovate Supply, Processing and Distribution Project No. 568-09-111 Invitation No. VA-263-09-RA-0079, Bid Opens: August 24, 2009, 2PM MST 1. Sheet 4: Construction Note A11 change to, New 12X12 VCT and 6 rubber base, Rooms B11 & B11A. 2. Sheet 8: Architectural Ceiling Notes-1, 2, 3, 4, reference work in Room B11A only. 3. Sheet 9: Plumbing Notes P13 references sheet 11A, change sheet 11A to sheet 12. 4. Sheet 10: The Contractor, at their option, may replace all FRP in Room 122A or replace only the FRP that is removed to install the plumbing vent. If the Contractor chooses to replace only a portion of the FRP it must match existing. 5. Sheet 14: Electrical Notes E5, change wall mounted heat pump to ceiling mounted heat pump. 6. Sheet 15: In the upper right hand corner delete Demolition Notes Add Alternate, Items 16-20 are not part of this project. 7. Sheet 16: New Construction Notes #7, change Cap abandoned waste line in this area, patch ceramic tile., to Cap abandoned waste line below floor in this area, patch ceramic tile. 8. Sheet 16: New Construction Notes #8, change 3-3/5metal studs to 3-5/8 metal studs. 9. Sheet 17: Note 5 under Countertop/shelves change Apply sound deadening materials on underside., to Apply fire resistive sound deadening materials on underside. 10. Sheet 17: The stainless steel counters/shelving units shown on this sheet, shall be furnished and installed by thecontractor. 11. Sheet 18: Delete Note B. 12. Sheet 18: Delete Note 19. 13. Sheet 18: Delete Add Alternate after Mechanical Demolition Notes, items 8-19 are not part of this project. 14. Sheet 18: The existing Amsco Sonic Energy Console (Note 7) will be relocated to the area of the existing stainless steel base cabinet/sink (Note 5), see Note 2 sheet 19. 15. Sheet 20: Delete Add Alternate after New Mechanical Work, items 14-21 are not part of this Project. 16. Sheet 20: Change 10-13 NOT USED to 11-13 NOT USED. 17. Sheet 16: Add Note 18, All gypsum board installed behind ceramic tile shall be water resistant. End of Addendum
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VABHHCS568/VABHHCS568/VA-263-09-RA-0079/listing.html)
 
Place of Performance
Address: Department of Veterans Affairs;VA Black Hills HCS;Fort Meade Campus;113 Comanche Rd.;Fort Meade, SD 57741<br />
Zip Code: 57741<br />
 
Record
SN01916405-W 20090820/090819001007-53f9876dec0e32907685f5f1b3303397 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.