SOLICITATION NOTICE

Y -- Design-Build (D-B) of a New Single Hayman Type Igloo, Hill AFB, Utah

Notice Date
8/18/2009
 
Notice Type
Presolicitation
 
NAICS
236210 — Industrial Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, US Army Engineer District, Sacramento, US Army Engineer District, Sacramento, 1325 J. Street, Sacramento, CA 95814
 
ZIP Code
95814
 
Solicitation Number
W91238-09-R-0057
 
Response Due
10/5/2009
 
Archive Date
12/4/2009
 
Point of Contact
Connie L Newell, 916-557-5229<br />
 
E-Mail Address
US Army Engineer District, Sacramento
(connie.l.newell@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This acquisition is proceeding as a 100% Small Business Set Aside Request for Proposal (RFP). Estimated Cost Range is between $ 500,000 and $ 1,000,000 Period of Performance for Construction: To Be Determined This Procurement will be conducted under FSC CODE: Y171, SIC CODE: 1541, NAICS Code: 236210. The size standard for this code is $33,500,000. All questions should be directed to the Contract Specialist, Connie Newell, @ connie.l.newell@usace.army.mil. Request for Proposal is estimated to be posted On or About 3 September 2009. Responses due are On or About 5 October 2009. Site Visit is to be scheduled approximately 7-10 days after posting of the solicitation. Project will be Design-Build (D-B) of a new single Hayman Type Igloo (193 SM). Construction of one earth covered, concrete reinforced Munitions Storage Magazine/Module (MSM), dimensioned 26-feet by 80-feet, with an approximate 26-foot wide blast doorway. MSM will be constructed on Pine Street, adjacent to existing Hayman Igloo, building 2589. Project includes concrete access road, reinforced aprons, utility connections (electricity & storm drainage), prewired exterior/interior lighting, IDS (duress, motion & perimeter/point detectors), prewired telephone/communication system, secured ventilation/fan system, lightning protection and other necessary support. During Design, contractors designer are expected to establish at least one three to five day Charrette, to clearly identify user requirements and summarize for clarification. Designer will then be expected to produce at least three (3) design document submittals (typically at 60%, 90% and 100% design stages). Designer and contractor will attend COE coordination meetings to summarize project status and address issues, for possible adjustment. This is in addition to the regular Construction management/scheduling responsibilities, expected from the contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA05/W91238-09-R-0057/listing.html)
 
Place of Performance
Address: U.S. Air Force Bldg 2590 Hill AFB UT<br />
Zip Code: 84056<br />
 
Record
SN01915579-W 20090820/090818235838-c45f37ff4d87df480c59ac5f83b6a888 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.