Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 16, 2009 FBO #2822
AWARD

C -- RECOVERY--C--Lower Willamette River Ecosystem Restoration General Investigation Feasilibility Study/ Draft PEIS

Notice Date
8/14/2009
 
Notice Type
Award Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Portland, Portland District, US Army Corps of Engineers, Contracting Division (CENWP-CT_, P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N09D00040008
 
Archive Date
10/21/2009
 
Point of Contact
Kathleen Seitz, 503/808-4628<br />
 
E-Mail Address
Portland District, US Army Corps of Engineers
(kathleen.d.seitz@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9127N09D00040008
 
Award Date
8/14/2009
 
Awardee
Inca/CH2M Hill JV<BR>9191 S Jamaica St<BR>Englewood,CO 80115-5946
 
Award Amount
573,375.00
 
Line Number
7001
 
Description
RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W9127N09D00040008. Portland District Corps of Engineers awarded Task Order number 00008 using recovery act funding to contract number W9127N-09-D-0004 awarded to CH2M Hill/Inca J.V. for the feasibility study of ecosystem restoration needs and opportunities within the Lower Willamette River Basin. The purpose of the feasibility study is to evaluate significant ecosystem degradation problems in the Lower Willamette River Basin; to formulate, evaluate, and screen potential solutions to these problems; and to recommend a series of actions and projects that have a federal interest and are supported by a local entity willing to provide the necessary items of local cooperation. The recommended plan will be formulated to contribute to the identified restoration objectives of restoring fish and wildlife habitat and natural processes of the basin. The Contractor shall assist CENWP with developing a draft Feasibility Report and Programmatic EIS for the Lower Willamette Ecosystem Restoration Study. The total amount of Recovery Act Funding used for this task order is $573,375.00
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N09D00040008/listing.html)
 
Record
SN01912334-W 20090816/090815002246-469b8cab25af24791f0ba28227805f3b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.