MODIFICATION
Z -- PAINT EXTERIOR OF OFFICE BUILDING AND REPAIR/REPLACE WINDOW SUB SILLS
- Notice Date
- 7/29/2009
- Notice Type
- Modification/Amendment
- NAICS
- 238320
— Painting and Wall Covering Contractors
- Contracting Office
- Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Western Region Acquisition Division, 7600 Sand Point Way, Northeast, Seattle, Washington, 98115-6349
- ZIP Code
- 98115-6349
- Solicitation Number
- AB133F-09-RB-0027
- Archive Date
- 9/3/2009
- Point of Contact
- John D. Cooley, Phone: 206-526-6032, Sharon S. Kent, Phone: (206) 526-6035
- E-Mail Address
-
John.D.Cooley@noaa.gov, sharon.s.kent@noaa.gov
(John.D.Cooley@noaa.gov, sharon.s.kent@noaa.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- PERIOD OF PERFORMANCE FOR THE TOTAL WORK IS 90 DAYS (NINETY DAYS). ORIGINALLY, THE PERIOD OF PERFORMANCE WAS ADVERTISED AS 60 DAYS. 90 DAYS IS NOW THE PERIOD OF PERFORMANCE! REGARDING WINDOW SUB-SILL REPLACEMENT: BIDDERS NEED TO BID TO THE ORIGINAL SPECIFICATIONS REGARDING SUB-SILL REPLACEMENT. IF BIDDERS WANT TO PROVIDE AN ADDITIONAL ALTERNATE METHOD (OR A SECOND BID) TO THE SUB-SILL REPLACEMENT, BIDDERS MAY DO SO, BUT MUST BID ON THE ORIGINAL WORK AND PROVIDE THE ALTERNATE METHOD SEPARATELY AND MARK IT PLAINLY THAT IT IS AN ALTERNATIVE METHOD AND ADD IT TO THE TOTAL OF THE WORK SEPARATE FROM THE ORIGINAL BID WORK SUCH THAT THE GOVERNMENT CAN BASICALLY DISCERN TWO BIDS, ONE WITH THE ORIGINALLY BID WORK AS DESCRIBED IN THE SOLICITATION, AND A SEPARATE TOTAL PRICE WITH THE "ALTERNATE" METHOD OF REPLACING THE SUB-SILLS. THE CONTRACTOR MUST SUBMIT A PLAN AND DRAWINGS WITH THE ALTERNATIVE METHOD BID. THE ALTERNATE BID MUST STATE THAT IT IS A BID THAT CONTAINS AN "ALTERNATE METHOD" AND STATE WHAT PART OF THE WORK CONTAINS AN ALTERNATE METHOD. SPACE FOR STAGING EQUIPMENT: THERE IS VERY LIMITED PARKING AND OTHER SPACE AT THE NOAA BUILDING. NOAA MAY BE ABLE TO ACCOMODATE SOME EQUIPMENT STAGING AT WORK SITE; HOWEVER, PLEASE KEEP PLAN TO KEEP STAGED EQUIPMENT TO A MINIMUM. GOVERNMENT IS NOT RESPONSIBLE FOR THE SECURITY OF ANY EQUIPMENT STAGED AT THE WORKSITE. REGARDING NOTICEABLE PAINT SURFACE VARIATIONS: YES, SINCE THE BUILDING IS QUITE OLD AND SOME PAINT IS CURRENTLY PEELING AND THE SURFACE WILL NEED TO BE PREPARED TO BE PAINTED, SURFACE VARIATIONS ARE ALLOWED (DO NOT NEED TO SAND TO THE SURFACE). AS LONG AS THE STRUCTURE GETS THE AMOUNT OF PAINT REQUIRED TO ADEQUATELY COVER AND PROTECT ALL INTENDED AREAS IN ACCORDANCE WITH THE SPECIFICATIONS (AND NORMAL INDUSTRY PRACTICES WHEN NOT SPECIFIED IN THE SPECIFICATIONS OR LAWS REGARDING SUCH), SURFACE VARIATIONS ARE NORMAL AND EXPECTED. IT WOULD BE VERY COSTLY TO SAND THE WHOLE BUILDING DOWN TO THE SURFACE IN ORDER TO PAINT IT. NO CHANGE IN BID TIME/DATE CLOSING WILL BE MADE. ORIGINAL CLOSING DATE/TIME APPLIES.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NOAA/WASC/AB133F-09-RB-0027/listing.html)
- Place of Performance
- Address: HONOLULU, Hawaii, United States
- Record
- SN01891160-W 20090731/090730000324-81f088b526a4411e9fc35f554a85070d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |