56 -- RENOVATION PROJECT

Notice Date
7/24/2009
 
Notice Type
Presolicitation
 
NAICS
236115 — New Single-Family Housing Construction (except Operative Builders)
 
Contracting Office
Department of the Navy, Bureau of Medicine and Surgery, NH Guam, Bldg #1, L-Wing, Rm K116, Farenholt Road, Agana Heights, 96919
 
ZIP Code
96919
 
Solicitation Number
N6809609T0089
 
Archive Date
8/25/2009
 
Point of Contact
Fia T Moso, Phone: 6713449297, Jesusa P Larrew, Phone: 671-344-9675
 
E-Mail Address
fia.moso@med.navy.mil, Sue.Larrew@med.navy.mil
(fia.moso@med.navy.mil, Sue.Larrew@med.navy.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a Pre-Solicitation Notice, U S Naval Hospital, Guam for a firm fixed price type contract for Renovation of C-311 Radiology Department Film Processing Dark Room, Bldg 1, third floor, Room C-311. The solicitation and any subsequent amendments will be posted on the Navy Electronic Commerce Online (NECO) Website: www.neco.navy.mil. Proposed contract to be procured using Simplified Acquisition Procedures. PLEASE SEE STATEMENT OF WORK BELOW FOR DETAILS. Date: 21 July 2009 US NAVAL HOSPITAL, GUAM FACILITIES MANAGEMENT DEPARTMENT DESCRIPTION OF WORK: Request services to prepare documentation and award contract for the renovation of C-311 Radiology Department Film Processing Dark Room, Building #1, U.S. Naval Hospital, Guam STATEMENT of WORK: The contractor shall provide all labor, materials, equipment, design built if required, supervision and incidental related work necessary for the renovation of C-311 Radiology Department Film Processing Dark Room, Building #1, U.S. Naval Hospital, Guam. The work includes, but is not limited to the following: a.Demolish partition wall and replacement of existing ceiling AC supply diffusers and lighting fixtures. Reconfigure the light fixtures, sprinklers and AC supply diffusers to suit new 2x4 ceiling configuration. Note: 2 bulbs on two separate fixtures shall be tied into our existing emergency power supply. b.Remove concrete chemical raised-berm, stoops and uneven concrete surface complete. c.Install one each lavatory sink complete with hot/cold water supply and drain lines. d.Remove all unused plumbing and electrical pipes. e.Install hanging cabinets for storage approximately 12"D x 40"H x 16'-0"long at north wall. f.Provide and install new Disconnect switch for 2 each Radiology Imaging equipment power source shall be from the 75kw Emergency Generators. g.Provide and install 4 each dedicated duplex outlets power from the new Emergency Generator Disconnect Switch. h.Relocate multiple network drops for computer equipments to newly provide dedicated outlets. i.Relocate 4 each conventional duplex power outlets (2 at north wall and 2 at south wall). j.Remove partial existing floor tile, approx 175sf and Install new floor tiles complete with 4" cove base, approx. 420sf to match tiles from the Hallway. k.Relocate 1 each overhead speakers complete with volume control to existing west wall. l.Remove existing exhaust fan complete with duct and seal opening in concrete wall. m.Prepare, prime and finish paint walls to include repair and touchup of existing adjacent disturbed walls resulted from new project. Special Conditions: 1)Construction and procedures shall be in conformance with the latest OSHA, NFPA, Interim Life Safety Measures (ILSM) and Infectious Control (IC) Standards of Hospital Environment. 2)Any Utility support/outages required to accomplish the renovation of E2 Wing (Pharmacy) shall be scheduled and coordinated with the BOS Contractor and prior notification shall be made to Naval Hospital Facilities Management Department. Any Cost for Utility Support shall be the responsibility of the Contractor. Requirement Upon Contract Award: 1)Pre-construction: Contractor will meet with the Facilities Management Department (FMD) representatives on elaborative efforts and means of the work or job to be accomplished. 2)ILSM: A meeting on Interim Life Safety Measures (ILSM) will be scheduled and conducted upon completion of Pre-Construction meeting. Representatives and officials from Naval Hospital Safety, Fire Safety, Infection Control, and Security will also be present at this meeting to ensure hospital requirements are adhered to and maintained at all times during construction. Contract/Work Acceptance: 1)The Facilities Contract Manager will perform a PRE-FINAL/quality assurance inspection. All discrepancies identified during pre-final will be re-worked and performed accordingly. 2)A FINAL INSPECTION will be performed, project cleared, and approved by Facilities Management Department before contractor is relieved from work or contracted job. ________________________________________ Point of Contact: Albert C. Garcia Email address: albert.garcia@med.navy.mil Telephone: 344-9636 Fax: 344-9379 or 344-9288
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/BUMED/N68096/N6809609T0089/listing.html)
 
Place of Performance
Address: U S NAVAL HOSPITAL GUAM, BLDG #1, L-WING, MATERIAL MANAGEMENT DEPT, AGANA HEIGHTS, 96910, United States
Zip Code: 96910
 
Record
SN01886091-W 20090726/090724235147-be15e0d60f6ad0b89474128484fdb2eb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.