Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 19, 2009 FBO #2792
MODIFICATION

56 -- STONE, LIMESTONE, CRUSHED

Notice Date
7/17/2009
 
Notice Type
Modification/Amendment
 
NAICS
212312 — Crushed and Broken Limestone Mining and Quarrying
 
Contracting Office
Department of the Army, Army Contracting Agency, South Region, ACA, Fort Campbell, ACA, Fort Campbell, Directorate of Contracting, Building 2174, 13 Indiana Street, Fort Campbell, KY 42223-1100
 
ZIP Code
42223-1100
 
Solicitation Number
W91248-09-B-0071
 
Response Due
7/27/2009
 
Archive Date
9/25/2009
 
Point of Contact
shirley.banks, 270-798-7857<br />
 
E-Mail Address
ACA, Fort Campbell
(shirley.banks@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Questions received from interested participants and our responses follow: Question 1: What size Rip Rap is being solicited? Answer: 6 to 9 inch. Question 2: Is the #57 being solicited washed or unwashed? Answer: Washed See revised bid schedule. Question 3: What is meant in CLINS 0001, 0002 and 0003 when you list the following Crushed Limestone Numbers 1, 2, 3, 6, 7, 710, 8, 810, 9, 10 and 11? Can you provide specifications for each material being requested? Answer: Size Specification for the various Aggregate identified in the Bid Schedule are from the Kentucky Department of Transporation and may be viewed and/or copied at the following Internet Address: (http://transportation.ky.gov/construction/spec/2008), Division 800, Section 805.15. See revised bid schedule that includes this clarification. Bid schedule has been revised to include this note. The synopsis/solicitation is also amended to delete all reference to W91248-09-B-0003, substituting W91248-09-B-0071 in lieu thereof; the classification code of P is deleted entirely and 56 is substituted in lieu thereof. Bid opening dated is extended from 20 July 2009 to 27 July 2009, 2:00 P.M. CT. Offers received after 2:00 P.M. CT 27 July 2009 will be rejected and not considered for award. Submit sealed bids (outside of envelopes marked with IFB W91248-09-B-0071 Limestone) to Mission & Installation Contracting Command, Directorate of Contracting, ATTN: Rana Steele, 2172 13 Street, Fort Campbell, KY 42223-5355. Point of Contact is Rana Steele, 270-798-7822, rana.y.steele@us.army.mil or June Fletcher-Schiewe, 270-798-3441, linda.j.fletcherschiewe@us.army.mil. Original Point of Contact: Rana Steele, 270-798-7822, rana.y.steele@us.army.mil Current Point of Contact: Rana Steele, 270-798-7822, rana.y.steele@us.army.mil REVISED BID SCHEDULE: BID SCHEDULE NOTE: ALL QUANTITIES ARE ESTIMATED. UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITYISSUE PRICE PRICE BASE PERIOD (12 Months): 0001 Stone, Limestone, Crushed, 15,000 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Standard Sizes to be Delivered to Stockpile at 1st & Tenn. 0002 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, East of Palmyra Road 0003 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, West of Palmyra Road 0004 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ To be Delivered to (2,000 LB) Stockpile at 1st & TN Streets 0005 Stone, Limestone, Crushed, 3,000 Net Ton $_________ $__________ 2, 9 & No. 57 washed to be (2,000 LB) Delivered to Stockpile at 1st & TN Streets 0006 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY East of Palmyra Road 0007 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dump and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, East of Palmyra Road UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITY ISSUE PRICE PRICE 0008 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dumped and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, West of Palmyra Road 0009 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY West of Palmyra Road TOTAL FOR CLINs 0001-0009, BASE YEAR $____________________ FIRST OPTION PERIOD (12 Months): 1001 Stone, Limestone, Crushed, 15,000 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Standard Sizes to be Delivered to Stockpile at 1st & Tenn. 1002 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, East of Palmyra Road 1003 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, West of Palmyra Road 1004 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ To be Delivered to (2,000 LB) Stockpile at 1st & TN Streets 1005 Stone, Limestone, Crushed, 3,000 Net Ton $_________ $__________ 2, 9 & No. 57 washed to be (2,000 LB) Delivered to Stockpile at 1st & TN Streets 1006 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY East of Palmyra Road UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITY ISSUE PRICE PRICE 1007 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dump and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, East of Palmyra Road 1008 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dumped and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, West of Palmyra Road 1009 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY West of Palmyra Road TOTAL FOR CLINs 1001-1009, FIRST OPTION YEAR $____________________ SECOND OPTION PERIOD (12 Months): 2001 Stone, Limestone, Crushed, 15,000 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Standard Sizes to be Delivered to Stockpile at 1st & Tenn. 2002 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, East of Palmyra Road 2003 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, West of Palmyra Road 2004 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ To be Delivered to (2,000 LB) Stockpile at 1st & TN Streets UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITY ISSUE PRICE PRICE 2005 Stone, Limestone, Crushed, 3,000 Net Ton $_________ $__________ 2, 9 & No. 57 washed to be (2,000 LB) Delivered to Stockpile at 1st & TN Streets 2006 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY East of Palmyra Road 2007 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dump and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, East of Palmyra Road 2008 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dumped and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, West of Palmyra Road 2009 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY West of Palmyra Road TOTAL FOR CLINs 2001-2009, SECOND OPTION YEAR $____________________ THIRD OPTION PERIOD (12 Months): 3001 Stone, Limestone, Crushed, 15,000 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Standard Sizes to be Delivered to Stockpile at 1st & Tenn. 3002 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, East of Palmyra Road UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITY ISSUE PRICE PRICE 3003 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, West of Palmyra Road 3004 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ To be Delivered to (2,000 LB) Stockpile at 1st & TN Streets 3005 Stone, Limestone, Crushed, 3,000 Net Ton $_________ $__________ 2, 9 & No. 57 washed to be (2,000 LB) Delivered to Stockpile at 1st & TN Streets 3006 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY East of Palmyra Road 3007 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dump and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, East of Palmyra Road 3008 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dumped and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, West of Palmyra Road 3009 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY West of Palmyra Road TOTAL FOR CLINs 3001-3009, THIRD OPTION YEAR $____________________ FOURTH OPTION PERIOD (12 Months): 4001 Stone, Limestone, Crushed, 15,000 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Standard Sizes to be Delivered to Stockpile at 1st & Tenn. UNIT OF UNIT TOTAL CLIN DESCRIPTION QUANTITY ISSUE PRICE PRICE 4002 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, East of Palmyra Road 4003 Stone, Limestone, Crushed, 12,500 Net Ton $_________ $__________ No. 1, 2, 3, 610, 710, 8, 9, 10, (2,000 LB) 11 & Dense Grade Aggregate. Tailgate Dump and/or Spread at Various Locations Within the boundaries of Ft. Campbell, West of Palmyra Road 4004 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ To be Delivered to (2,000 LB) Stockpile at 1st & TN Streets 4005 Stone, Limestone, Crushed, 3,000 Net Ton $_________ $__________ 2, 9 & No. 57 washed to be (2,000 LB) Delivered to Stockpile at 1st & TN Streets 4006 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY East of Palmyra Road 4007 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dump and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, East of Palmyra Road 4008 Stone, Limestone, Crushed, 1,500 Net Ton $_________ $__________ 2, 9 & No. 57 washed, Tailgate (2,000 LB) Dumped and/or Spread At Various Locations Within the Boundaries of Ft. Campbell, West of Palmyra Road 4009 Stone, Rip-Rap (6-9)5,000 Net Ton $_________ $__________ Tailgate Dump and/or Spread at (2,000 LB) Various Locations Within the Boundaries of Ft. Campbell, KY West of Palmyra Road TOTAL FOR CLINs 4001-4009, FOURTH OPTION YEAR $____________________ RECAP: TOTAL FOR CLINs 0001-0009, BASE YEAR $____________________ TOTAL FOR CLINs 1001-1009, FIRST OPTION YEAR $____________________ TOTAL FOR CLINs 2001-2009, SECOND OPTION YEAR $____________________ TOTAL FOR CLINs 3001-3009, THIRD OPTION YEAR $____________________ TOTAL FOR CLINs 4001-4009, FOURTH OPTION YEAR $____________________ TOTAL FOR CLINs 0001-4009, BASE & 4 OPTION YEARS $____________________ NOTE: Size Specification for the various Aggregate identified within this Bid Schedule may be viewed and/or copied at the following Internet Address: (http://transportation.ky.gov/construction/spec/2008), Division 800, Section 805.15.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABK/DABK09/W91248-09-B-0071/listing.html)
 
Place of Performance
Address: ACA, Fort Campbell Directorate of Contracting, Building 2174, 13 Indiana Street Fort Campbell KY<br />
Zip Code: 42223-1100<br />
 
Record
SN01879728-W 20090719/090718000839-174ad284cdf3b4fda94eeba82511c2ec (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.