MODIFICATION
B -- Egypt - Positive Train Control System Feasibility Study
- Notice Date
- 7/16/2009
- Notice Type
- Modification/Amendment
- NAICS
- 541690
— Other Scientific and Technical Consulting Services
- Contracting Office
- United States Trade and Development Agency, USTDA, USTDA, 1000 Wilson Boulevard, Suite 1600, C/O US TDA 1000 Wilson Boulevard, Suite 1600, Arlington, Virginia, 22209-3901
- ZIP Code
- 22209-3901
- Solicitation Number
- 2009-21021A
- Archive Date
- 9/25/2009
- Point of Contact
- John Kusnierek, Phone: (703) 875-4357
- E-Mail Address
-
jkusnierek@ustda.gov
(jkusnierek@ustda.gov)
- Small Business Set-Aside
- N/A
- Description
- ***RFP Amendment*** 1. Question: Can a US consultant and supplier participate jointly in this feasibility study? If a consultant-supplier team were selected, does this mean that supplier would then be precluded from a later PTC implementation stage where actual hardware and software is provided? Answer: U.S. suppliers cannot be part of the feasibility study contractor team either as the main contractor or subcontractor. U.S. suppliers who participate in the USTDA funded feasibility study will not be able to participate in the follow on pilot or implementation phases of the project. 2. Amended Award Criteria: Section 4: AWARD CRITERIA Individual proposals will be initially evaluated by a Procurement Selection Committee of representatives from the Grantee. The Committee will then conduct a final evaluation and completion of ranking of qualified Offerors. The Grantee will notify USTDA of the best qualified Offeror, and upon receipt of USTDA's no-objection letter, the Grantee shall promptly notify all Offerors of the award and negotiate a contract with the best qualified Offeror. If a satisfactory contract cannot be negotiated with the best qualified Offeror, negotiations will be formally terminated. Negotiations may then be undertaken with the second most qualified Offeror and so forth. The selection of the Contractor will be based on the following criteria: Maximum Points (100) 1. General Experience and Qualifications (10 points) 1.1 Overall experience of the firm 3 1.2 Overseas experience 3 1.3 Experience in Arab countries 4 2. Specific Applicable Experience (15 points) 2.1 Amount of experience with of Train Control Systems 15 3. Approach and Methodology (30 points) 3.1 Knowledge of proposed work and understanding of the services to be performed as demonstrated by the specific details of the firm's proposal 15 3.2 Appropriateness of the proposed methodology and work plan 10 3.3 Appropriateness of the proposed Training Program as demonstrated by the specific details of firm's proposal 5 4. Qualifications of Proposed Key Personnel (35 points) 4.1 Qualifications of project leader 20 4.2 Qualifications of other team professionals 15 5. Overall Impression (10 points) 10 Total 100 Proposals that do not include all requested information may be considered non-responsive. Price will not be a factor in contractor selection.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/TDA/TDA1/TDA1/2009-21021A/listing.html)
- Record
- SN01878136-W 20090718/090717000931-91a1af31fa75299ba29bafec44080a10 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |