SOLICITATION NOTICE
Z -- Project No. 657A4-09-0101, FCA-Update HVAC Phase 6 (includes Phase 7) VAMC, PB
- Notice Date
- 7/7/2009
- Notice Type
- Justification and Approval (J&A)
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- Department of Veterans Affairs, VA Heartland Network, Department of Veterans Affairs Heartland Network, Department of Veterans Affairs;VISN 15 Contracting (Eastern Orbit);#1 Jefferson Barracks Drive;St. Louis, MO 63125-4199
- ZIP Code
- 63125-4199
- Solicitation Number
- VA-255-09-RP-0403
- Archive Date
- 7/11/2009
- Point of Contact
- Pat CzajkowskiContracting Officer<br />
- E-Mail Address
-
Contracting Officer
(pauline.czajkowski@va.gov)
- Small Business Set-Aside
- N/A
- Award Number
- VA255-C-1246
- Award Date
- 6/26/2009
- Description
- Justification For Other Than Full & Open Competition(REF: FAR 6.303) 1.Identification of Agency and Contracting Activity VISN 15 Contracting Section, Construction/A-E Team (10N15-90) 2.Nature/Description of Action SDVOSB Sole-Source Construction Contract. 3.Description of Supplies/Services HVAC Upgrade Phases 6 and 7 as identified under project numbers 657A4-09-0101 and 657A4-09-0110AO at the Poplar Bluff, Missouri, VAMC. Estimated Value: $1,500,000 4.Identification of Statutory Authority ( ) 41 U.S.C. 253 (c) (1) Only One Responsible Source ( ) 41 U.S.C. 253 (c) (2) Unusual and Compelling Urgency ( ) 41 U.S.C. 253 (c) (3) Industrial, Mobilization, Engineering, Developmental, or Research Capability or Expert Services ( ) 41 U.S.C. 253 (c) (4) International Agreement (X) 41 U.S.C. 253 (c) (5) Authorized or Required by Statute, 38 USC 8127 per PL 109-461 ( ) 41 U.S.C. 253 (c) (6) National Security ( ) 41 U.S.C. 253 (c) (7) Public Interest 5.Rationale in support of citation in Paragraph 4 above: a.Description of contractor and or of acquisition action that demonstrates that the proposed contractors unique qualifications or the nature of the acquisition requires use of the authority cited: The estimated dollar amount is: (1) over the SAP Threshold; (2) under $5 Million; and (3) under the SBA Small Business Threshold of $31.5 Million. On that basis, this project is a good candidate for a SDVOSB Sole-Source as authorized by the Veterans First Contracting Program (Ref: IL 049-07-08). b.Efforts made to ensure that offers are solicited from as many potential sources as practical: (N/A) c.If the Sole Source Exception (c) (1) was chosen, state the date of synopsis or the basis for waivers. The basis for the synopsis being waived is IL 049-07-08. d. If the Urgency Exception was chosen and this J&A was prepared after the procurement action was carried out, state the reasons. (N/A) The above acquisition will be negotiated with: HAMMER LGC, INC. 4 W ENGLISH ST SAMSON, AL 36477-1152 POC: MIKE PASCOE PH: 334-898-2700 6.Determination of a Fair and Reasonable Cost The Contracting Officer determines that the anticipated cost to the government will be fair and reasonable because a complete analysis of all costs or a price analysis will be fully utilized prior to award of the contract. Note: The resulting Price Negotiation Memorandum (PNM) will document this for the contract file. 7.Description of market survey and any interested sources. If no market survey was conducted, state the reason. The firm selected for the SDVOSB sole-source negotiated award is HAMMER LGC. INC. This firm has been in business since 1990, and has successfully provided construction services to the Department of Veterans Affairs, various VA Medical Centers in VISN 15 on other projects and has specifically provided construction services to VAMC in Poplar Bluff. They have an adequate bonding capability for a project of this size. They have demonstrated their responsibility, quality of workmanship and skills to provide the necessary services for a project of this size and complexity. The Contracting Officer has confirmed the contractors experience and capability. 8.Additional Support for the use of other than full and open competition: a. Explanation of why technical data, specifications, engineering descriptions, statement of work or purchase descriptions suitable for full open and competition have not been developed or are not available: NA b. When the sole source exception is used in the case of a follow-on acquisition, provide an estimate of the cost that would be duplicated and describe how the estimate was derived if the contract is awarded to other than the incumbent: N/A c. When the urgency exception is cited provide the data, estimate of cost or other rationale as to the extent of harm to the government if the contract is not awarded expediently: N/A 9.Sources expressing an interest: None, other than the Sole-Source identified above. 10. Actions, if any, being taken to remove barriers to full and open competition: N/A (Authorized by statute) 11. Delivery Requirements: Completion within 180 calendar days of NTP for Construction Phase. 12. Acquisition Plan: An Acquisition Plan (X ) is () is not required for this acquisition. 13. IT Approval: IT Approval ( ) is (X) is not required for this acquisition. If it is, include appropriate approvals. Contracting Officers Certification The Contracting Officer has determined that the justification is accurate and complete to the best of the Contracting Officer's knowledge and belief. /s/ Pauline D. Czajkowski Pauline D. Czajkowski 5/14/09 Contracting Officer Date CONCURRED BY: /s/ Ricky Lemmon___________________ 5/15/09 Ricky Lemmon Date Contracting Activity Competition Advocate (Over $500K not exceeding $10.0 Million, per VAAR 806.304(a) )
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/LeVAMC/VAMCKS/VA-255-09-RP-0403/listing.html)
- Record
- SN01867075-W 20090709/090708000405-4efa8689258cdfa10cecb34684060c0d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice