Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 01, 2009 FBO #2774
SOLICITATION NOTICE

54 -- WALK-IN COOLER FACILITY KIT - RFQ for Walk-In Cooler Facility Kit

Notice Date
6/29/2009
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
Department of the Air Force, Air Combat Command, 1st CONS, 74 Nealy Avenue, Suite 100, Langley AFB, Virginia, 23665
 
ZIP Code
23665
 
Solicitation Number
W91B4K-09-T-3021
 
Archive Date
7/25/2009
 
Point of Contact
Christina Gunderman,
 
E-Mail Address
christina.gunderman@afghan.swa.army.mil
(christina.gunderman@afghan.swa.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Specifications for Walk-In Cooler Facility Kit Solicitation for Walk-In Cooler Facility Kit Overall facility: 2600 square feet and/or 26000 cubic feet Freezer: 1300 square feet and/or 13000 cubic feet Refrigerated: 800 square feet and/or 8000 cubic feet Dry storage/vestibule: 500 square feet or 5000 cubic feet Operating Conditions: Facility must operate in outdoor ambient 120 degrees Fahrenheit at average 60% relative humidity, maintaining freezer temperature of -10F degrees, refrigerated storage of +35F, and dry storage/vestibule temperature of +70F degrees. Some product will enter the facility at ambient outdoor temperature, some will enter at chilled temperature. Construction Materials: Facility must be a “kit” that can be installed by construction personnel not necessarily trained in erection of this particular type of structure. Facility shall consist of all materials and be self-contained for erection in a harsh outdoor climate (does not need to be placed inside of another facility). At a minimum, facility shall have a sloped roof and be able to withstand sun/wind/precipitation/extreme heat and cold. Facility shall include all materials, engineered drawings, and instruction manuals necessary for preliminary foundation/slab construction and erection of facility to include minimum components: structural, insulation, doors, controls, cooling systems (to include refrigerant). Interior and exterior surfaces shall have a rigid and glossy finish in order to facilitate cleaning Electrical Power Source: 3-phase, 60 Hz Lighting: Facility must include an interior lighting system. Doors: Facility kit shall include a necessary number of minimum 8 foot wide bi-parting powered sliding doors. Access to the refer/freezer should be only from the dry storage/vestibule area to minimize air transfer. (2) hinged doors shall also be included, in accordance with the attached conceptual drawings. Shipping: Facility “kit” shall be shipped in shipping containers and include shipping to nearest military port facility for transportation through military channels to Afghanistan.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/1CONS/W91B4K-09-T-3021/listing.html)
 
Place of Performance
Address: FOB Fenty, Jalalabad, Afghanistan, APO, Non-U.S., 09310, United States
Zip Code: 09310
 
Record
SN01860544-W 20090701/090630001557-2bf9b8fbe2020a173ba30279a880db47 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.